XEC – Chilled/Hot Water Coil Unit
XEC800 – XEC9000
Manufactured
Manufactured
by Armcor
by Armcor

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the XEC Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Armcor XEC Series

  • Page 1 Installation and Operation Manual XEC – Chilled/Hot Water Coil Unit XEC800 – XEC9000 Manufactured Manufactured by Armcor by Armcor...
  • Page 2: Table Of Contents

    Contents Equipment Application Safety Location of Equipment Minimum Access Requirements for Maintenance Noise Levels Fresh Air Inlet and Exhaust Air Outlet Drainage Installation Instructions Unpacking and Inspection Unit Handling Lifting with a Crane Lifting with a Forklift Suspending the Unit Equipment Connections Ductwork Filters...
  • Page 3: Equipment Application

    Equipment Application The XEC series combines ERV with an inbuilt chilled water and/or hot water coil to condition the air following the heat recovery process. The unit configuration suits external rooftop or plant room applications and comes standard with EC Plug Fans and an option of enthalpy or sensible plate heat exchange media.
  • Page 4: Safety

    Check with Armcor Air Solutions for any information required on this equipment. DANGER Electrical shock can cause personal injury or death.
  • Page 5: Location Of Equipment

    - Every proposed installation must be subject to an engineered design by a mechanical services consultant. Armcor Air Solutions is not responsible Drainage for installation of equipment in situations for which the equipment was not designed or specified.
  • Page 6: Installation Instructions

    If damage is evident it should be noted on the freight Wear safety goggles, work gloves, work boots and docket and contact is to be made with the Armcor protective clothing. Air Solutions sales office. A claim should be lodged •...
  • Page 7: Equipment Connections

    • The power requirement and voltage are detailed on for the specified airflow without excessive pressure the equipment technical specifications (available at armcor.com.au) and are on the identification/serial levels. The unit should be situated as close as possible to the point of use to prevent unnecessary no.
  • Page 8: Standard Equipment Layout

    Standard Equipment Layout Fresh Air Exhaust Air Supply Air Return Air Return Air Air that is drawn from conditioned area. Exhaust Air Air discharged to outdoors. Fresh Air Use a fresh air cowl or grill to introduce fresh air. Supply Air Connect to the Airconditioning system or directly into the conditioned area.
  • Page 9: General Maintenance

    • Armcor Air Solutions are pleased to provide expert • Cleanable Filters. advice on special service maintenance requirements If filters are cleanable, they should be cleaned once a for particular installations.
  • Page 10: Warranty

    Warranty The Armcor Air Solutions Warranty Policy should be read in conjunction with the Terms and Conditions of Sale. These are available on our website armcor.com.au What The Warranty Policy Covers • Any warranty work performed by Armcor Air Solutions outside of Melbourne metro area will...
  • Page 11: Pre-Start Checklist

    Pre-start Checklist Unit Installation and Connections Check that equipment is fully installed in accordance with the installation instructions Visually check that air flows will not be obstructed Electrical Visually check all field wiring Tighten all electrical connections including all factory wiring connections Ensure supply cable is correct size Check the required supply voltage is available on all phases Check overload settings are correct (if applicable)
  • Page 12: Commissioning Checklist

    Commissioning Checklist General Air Filters: Overall Size and Number Drain Pipe Traps and Vents fitted to Indoor Unit as per Installation Instructions Y / N Drain is Clearing Water Properly Y / N Check Vibration of Unit OK / EXCESSIVE Paint Finish Checked and Repaired Y / N Ducting...
  • Page 13 Notes ........................................................................................................................................................................................................................................................XEC – Chilled/Hot Water Coil Unit Installation and Operation Manual 2021...
  • Page 14 Notes ........................................................................................................................................................................................................................................................XEC – Chilled/Hot Water Coil Unit Installation and Operation Manual 2021...
  • Page 15 Notes ........................................................................................................................................................................................................................................................XEC – Chilled/Hot Water Coil Unit Installation and Operation Manual 2021...
  • Page 16 E: sales@armcor.com.au P: (03) 8301 9200 109–111 Northcorp Blvd Broadmeadows Vic 3047 © 2021 Armcor Air Solutions reserves the right to alter products and specifications without notice and does not accept responsibility for possible errors and omissions in published documentation.