Summary of Contents for Wahsega WL-ZN-CTR-1CH-INF-R
Page 1
IP Paging Zone Controller with InformaCast ® Installer’s Guide Getting Started This step-by-step guide will help you install your Wahsega IP Paging Zone Controller with InformaCast. InformaCast Zone Controller Installation Guide Page 1 11.11.2020...
What’s in the Box (1) IP Paging Zone Controller (1) 2-Pin male connector (1) 6-Pin male connector (1) 8-Pin male connector (1) Ferrite cable clamp InformaCast Zone Controller Installation Guide Page 2 11.11.2020...
What You Will Need PoE power Power-over-Ethernet (PoE 802.3af) switch Remote communication point InformaCast Server Network cable (Cat 5e or Cat 6) Audio cable(s) with RCA mono male connector InformaCast Zone Controller Installation Guide Page 3 11.11.2020...
Page 4
Wiring Power Option A: To use Power-over-Ethernet (POE 802.3af), route a Cat 5e or Cat 6 Ethernet cable from a PoE switch or injector to the LAN port. Option B: Alternately, use the included 2-pin male connector to connect +9-16VDC and Ground wires for power. Use standard (unpowered) Ethernet for data.
Page 5
Audio Outputs LINE OUT (unbalanced) – Connect to amplifier via RCA mono connector. Configure audio settings in configuration webpages as described in User’s Guide. RELAY (Single Channel Zone Controller only) – The relay connector is a 3-pin male connector (included), wired to a Form C relay (SPDT) with contacts rated for 30VDC or 270VAC at 3A.
Page 6
Dimensions Front Rear InformaCast Zone Controller Installation Guide Page 6 11.11.2020...
Page 7
Side InformaCast Zone Controller Installation Guide Page 7 11.11.2020...
Page 8
Standards Compliant This product is designed and manufactured in the USA. ROHS compliant Temperature rating -40C to +60C. InformaCast Zone Controller Installation Guide Page 8 11.11.2020...
Page 9
Wahsega IP Paging Zone Controller With InformaCast WL-ZN-CTR-1CH-INF-R WL-ZN-CTR-2CH-INF Installation Guide InformaCast Zone Controller Installation Guide Page 9 11.11.2020...