naturaled Bollard Installation Manual

Advertisement

Quick Links

Installation Guide
V1.0
LED 5.5" Bollard
Page 1-7
120-277
WET
LED 5.5" Bollard
Accessories
Buried Type-L screw (3 pcs)
Screw fixed plate (1 pc)
M10 Hexagon nut (3 pcs)
or
φ10.5*φ20*2mm Flat washer (3 pcs)
φ10*φ16*2.7mm Spring washer (3 pcs)
M5*10 Screw (3 pcs)
LED
Flat Head
Round Head
Sealing ring (1 pc)
MADE IN CHINA

Advertisement

loading

Summary of Contents for naturaled Bollard

  • Page 1 Installation Guide V1.0 LED 5.5“ Bollard Page 1-7 120-277 LED 5.5” Bollard Accessories Buried Type-L screw (3 pcs) Screw fixed plate (1 pc) M10 Hexagon nut (3 pcs) φ10.5*φ20*2mm Flat washer (3 pcs) φ10*φ16*2.7mm Spring washer (3 pcs) M5*10 Screw (3 pcs)
  • Page 2 Installation Guide V1.0 LED 5.5“ Bollard Page 2-7 Flat head installed as example. Figure 1 Ensure power is o before installation. Fix the screw position with type-L screws xed plate and ll with cement. As shown in gure 1-2. Asegúrese de que la energía esté apagada antes de la instalación.
  • Page 3 Installation Guide V1.0 LED 5.5“ Bollard Page 3-7 Flat head installed as example. Figure 5 Connect the cable to the wiring terminal according to wiring diagram. Conecte el cable al terminal de cableado de acuerdo con el diagrama de cableado.
  • Page 4 Below instructions should be followed to minimize condensation of moisture on the inside of the lens : Spray expanding foam, used to fill and seal the base of the bollard body. Figure 1 Make certain power is switched OFF before starting installation.
  • Page 5 Below instructions should be followed to minimize condensation of moisture on the inside of the lens : Spray expanding foam, used to fill and seal the base of the bollard body. Figure 3 Allow time for foam to expand, then visually inspect to con rm the foam does not contain gaps between the foam and the conduit, or the foam and the inside of the bollard body.
  • Page 6 Insérez la plaque de type 3 dans la tête du luminaire. Figure 5 Fix the M12 nut and waterproof connector of the bollard head. Fijar la tuerca M12 y el conector estanco de la cabeza de la pilona. Fixez l'écrou M12 et le connecteur étanche de la tête de borne.
  • Page 7 Flat head installed as example. Figure 6 Place the head in the body and lock with M5*10 screws. Complete the bollard installation following all NEC and applicable local Codes and Ordinances. Coloque la cabeza en el cuerpo y bloquéela con tornillos M5*10.