Download Print this page

Kanga Kare KK1677 Installation Instructions

Horizontal diaper changing station

Advertisement

Quick Links

KK1677
Horizontal Diaper Changing Station
Installation Instructions

Advertisement

loading

Summary of Contents for Kanga Kare KK1677

  • Page 1 KK1677 Horizontal Diaper Changing Station Installation Instructions...
  • Page 2 ASSEMBLY INSTRUCTIONS ADULT INSTALLATION REQUIRED. TOOLS REQUIRED: Level(A) Measuring tape(B) Power drill with 7/32” , 1/8” and 1/2” masonry bits(C) Power screwdriver with bull nose phillips bit(D) • READ ALL INSTRUCTIONS BEFORE ASSEMBLY OF Diaper Changing Station. • Unpack carton and identify all parts. PART SLIST Parts Description Quantity...
  • Page 3 WARNING • A stud MUST be located and used for at least one side of the diaper changing station. The diaper changing station is no stronger than the anchors or walls to which they are attached and, therefore, • MUST be firmly secured in order to support the weight they are intended to support.Contact an architect or building contractor if any questions.
  • Page 4 RECOMMENDED BLOCKING: If the walls do not have studs on center, then additional blocking is necessary (Fig.e). Contact an architect or building contractor to make sure the blocking is adequate and complies with building codes. OPERATION: Rotate base downward. Place infant on top of the changing surface. Use restraint system as described below.