Page 2
SPECIAL PRECAUTIONS For Schier SV24 Sampling Port Installations - Failure to follow this guidance voids your warranty DO NOT AIR TEST UNIT OR RISER SYSTEM! Do not install this unit in any manner Doing so may result in property damage, personal injury or death.
Page 3
GETTING TO KNOW THE SV24 Pickable Cast Iron Cover (standard) 6. Cover Adapter Gasket 10. 4" Plain End Connection Assembly(x2) with Upper and Lower (standard) (x2) 2. Cover Gasket Stainless Steel Band Clamps 11. Composite Cover Bolts 3. Safety Star 7.
Page 4
Lay a level bed of well-packed, crushed aggregate Excavate hole at least 12" larger than sampling port (approximately 3/4" size rock or sand, with no fines) on all sides and 6" deeper than port bottom. in the base of hole. SV24 Installation Guide page 4 of 8...
Page 5
Do not solvent weld. Vent per local code. 4" Plain End DETAIL The SV24 sampling port comes from the factory ready to connect to 4" drain lines. 6" Connections Only Cut off the 4" connections at the...
Page 6
BURIED INSTALLATION Bring Cover Flush-to-Grade The SV24 is ready for burial depth of 16" from finished grade to bottom of unit (or 13-1/2" to centerline of inlet). Deeper burials will require extending the Cover Adapter and possibly adding risers. Measure dimension X to determine riser height needed.
Page 7
FLOOR BELOW INSTALLATION DETAIL Connect Piping vent per local code 4" Plain End composite cover C24H2 The SV24 sampling port comes from the factory ready to connect to 4" drain lines. 6" Connections Only Cut off the 4" connections at the Mechanically DETAIL premarked cut lines.
Page 8
ON THE FLOOR INSTALLATION Install Above Grade Support (by others) To prevent tipping and damage to drain SIDE VIEW FRONT VIEW line connections, SV24 above grade installations must be supported by a Composite Cover C24H2 structure (not included) built on-site. The...
Need help?
Do you have a question about the SV24 and is the answer not in the manual?
Questions and answers