Download Print this page

Advertisement

Quick Links

HIVE
ASSEMBLY INSTRUCTIONS
Designers of acoustic and
environmentally sustainable
office solutions

Advertisement

loading

Summary of Contents for 14six8 HIVE

  • Page 1 HIVE ASSEMBLY INSTRUCTIONS Designers of acoustic and environmentally sustainable office solutions...
  • Page 2 HIVE ASSEMBLY INSTRUCTIONS COMPONENTS Connector Hexagonal insert Strut...
  • Page 3 HIVE ASSEMBLY INSTRUCTIONS STEP 1 STEP 2 • Begin by assembling 1 complete hexagon using the struts • Assemble additional hexagons as shown in step 2, 3 and 4 using and connectors as shown above. struts and connectors.
  • Page 4 HIVE ASSEMBLY INSTRUCTIONS STEP 3 STEP 4...
  • Page 5 HIVE ASSEMBLY INSTRUCTIONS STEP 5 STEP 6 • Continue building your structure as per your design layout • The hexagonal inserts can be added in at any time during your build by simply assembling additional hexagons onto the system. from either side or even from both sides.
  • Page 6 HIVE ASSEMBLY INSTRUCTIONS Suggested suspension points...
  • Page 7 HIVE ASSEMBLY INSTRUCTIONS Sheet Thickness 12mm Dimensions Each hexagon 908 (w) x 807 (h) x 240 (w) Suggested Fixings Option 3: 12mm Aluminium U channel with Option 1: Direct hanging code (Clamp needs to be 12mm) Option 2: Activity code with Round single hole Aluminium clip.
  • Page 8 Telephone Francois: +44 7305 349443 Daniel: +27 82 331 8319 Email studio@14six8.com HIVE Website www.14six8.com Address 71-75, Shelton Street, Covent Garden, ASSEMBLY INSTRUCTIONS London, WC2H 9JQ, United Kingdom...