Packaging Contents
• 1 x Cable Manager (CABLMANAGER4 is 2 pieces)
• 8 x M8 Screw, Nut and Washer
System Requirements
• Open Frame server rack (2 or 4 post)
Required Tools
• 2 x Adjustable Wrench
Installation
If the rack uses L-style vertical posts, locate the mounting
1.
points along the outer side of the posts. Ensure they line up
correctly to the mounting points along the side of the Cable
Manager.
NOTE: Some racks may not have these mounting points,
so may need to be drilled or otherwise modified to
accommodate the Cable Manager.
For the most up-to-date information, please visit: www.startech.com
*Photos are for reference only
Using the screw, washer and nut, secure the Cable Manager
2.
to the side of the vertical rack posts. At minimum, make
sure the bottom and top of the Cable Manager are properly
secured.