Advertisement

Quick Links

®
2022
Series
liteServer
T20 –
Installation Manual

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the liteServer T20 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for Samcon liteServer T20 Series

  • Page 1 ® 2022 Series liteServer T20 – Installation Manual...
  • Page 2: Table Of Contents

    Table of contents Introduction ......................4 Technical data ......................4 Characteristic values for explosion protection ............. 4 2.1.1 Optional marking ........................4 2.1.2 Standard basis and certificate ....................5 Electrical parameters ................... 6 2.2.1 Voltage supply: .......................... 6 2.2.2 Performance, temperatures and temperature classes .............. 6 General safety instructions and special conditions ..........
  • Page 3 Approved by the EX Supervisor 18.05.2022 S.Seibert Compilation of the document Digital unterschrieben von Steffen Seibert DN: cn=Steffen Seibert, 25.04.2023 E. Schneider Several corrections o=SAMCON Prozessleittechnik GmbH, email=s.seibert@samcon. eu, c=DE Datum: 2023.04.28 10:56:11 +02'00' Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 3 of 24...
  • Page 4: Introduction

    Introduction ® The liteServer Series (type 20) is an electrical device. It is certified and approved as a flameproof lumination system. The luminaires may be used in Ex-zones 1, 2, 21 and 22, including the explosion group IIC (for example, acetylene) and IIIC (conductive and com- bustible dust).
  • Page 5: Standard Basis And Certificate

    WARNUNG: NICHT INNERHALB EINES EXPLOSIONSGEFÄHRDETEN BEREICHS ÖFFNEN Sicherheitshinweise in der Installationsanleitung beachten! -------------------------------------------------------------------------------------------------------------------- WARNING: DO NOT OPEN IN POTENTIALLY EXPLOSIVE ATMOSPHERES Observe the safety instructions in the installation guide! -------------------------------------------------------------------------------------------------------------------- ВНИМАНИЕ: НЕ ОТКРЫВАТЬ в потенциально взрывоопасных средах Соблюдайте инструкции по технике безопасности в руководстве по установке! AVERTISSEMENT: NE PAS OUVRIR EN ATMOSPHÈRES EXPLOSIBLES Respectez les consignes de sécurité...
  • Page 6: Electrical Parameters

    Electrical parameters 2.2.1 Voltage supply: The following electrical limit values are maximum values in the context of the approval. Please observe the device-specific values stated in the respective user manuals! Type T20..: Input voltage 60 V DC / 240 V AC (50/60 Hz) 2.2.2 Performance, temperatures and temperature classes ®...
  • Page 7 T4 (135°C - 5K) T3 (200°C - 40K) [°C] T20-… therm VA0.1 12.0 n.a. n.a. n.a. n.a. n.a. n.a. n.a. VA0.4 12.7 n.a. n.a. n.a. n.a. n.a. n.a. n.a. VA1.1 34.8 26.1 17.4 13.0 47.8 39.1 30.4 21.7 13.0 VA1.2 36.4 27.3 18.2...
  • Page 8: General Safety Instructions And Special Conditions

    Attention! Only original parts from SAMCON Prozessleittechnik GmbH may be used for repair. Repair works affecting the explosion protection may only be carried out in accordance with the regulations applicable in the country of use and only by SAMCON Prozessleittechnik GmbH.
  • Page 9: Area Of Application

    When using the luminaire, adhere to the data specified on its type plates and indicating labels! Applications other than described above are not allowed without written permission from SAMCON Prozessleittechnik GmbH. Attention! Observe the instructions on the type plates and indicating labels! Attention! in the mining sector with a “high”...
  • Page 10: Transportation And Storage

    doing assembly work, pay attention to the laser beam reflection of re- flective surfaces! All parts of the housing materials, including all external metallic and non-metallic compo- nents, are made of high-quality materials to ensure corrosion protection and chemical re- sistance levels required for the area of application, in "regular"...
  • Page 11: Commissioning

    Commissioning Installation For the luminaires’ installation and operation, the relevant national regulations, as well as the generally accepted rules of technology shall prevail. Before mounting the lighting fix- ture, thoroughly check it for any transport damage, especially at the housing and cable. Installation, electrical connection and the first commissioning must only be carried out by qualified personnel.
  • Page 12: Type T20-Va2.3

    Fig. 6-1: T20-VA1.1 to VA2.2. Mounting options For process lumination, the light can be mounted by means of a hinge attachment suitable for every application (e.g. on sight glass fittings in accordance with DIN 28120/28121 or DIN 11851), see Figure 6-1 right. Details and availability of accessories are described in the User Manual for the applicable T20 device.
  • Page 13: Type T20-Va4.X

    Fig. 6-2: T20-VA2.3 Safety wire For detailed assembly instructions on installation components and accessories, please visit http://samcon.eu 6.1.3 Type T20-VA4.x The light Typ T20-VA4.1K.PS1 is installed in a hanging, standing or lying position. Opening and closing the housing 6.2.1 Type T20-VAx.x.x.x Attention! The pressure-resistant type T20-VAx.x.x.x may only be opened if it is...
  • Page 14 In all other cases, the explosion-proof housing may only be opened and closed by authorized staff of SAMCON Prozessleittech- nik GmbH. Any damages, irregularities, or changes which, through the transparent open- ®...
  • Page 15 Carefully pull out the cable and supply flange to the rear and strictly vertically/per- pendicularly (see Figure 6-4). There is a risk of side tilt! Because of negative pres- sure, it may be difficult to remove the flange. H8f7 H8G7 The circular cylindrical clearance fit (in accordance with ISO 286) of the lighting body and flange must not be tilted! Risk of damage to the flame-proof...
  • Page 16: Electrical Connection And Commissioning

    Attention! If the fitting gap is mechanically damaged, it is no longer allowed to use the housing! Attention! Ensure that no foreign objects are entrapped in the housing. Exclusively use undamaged and clean original screws included in the supply. The dismantled screw locks (spring washers DIN 127A) must be used again.
  • Page 17: Supplementary Elements (Suitable Cables & Cable Glands)

    Prior to commissioning, all tests must be carried out, as indicated by the national regula- tions. Furthermore, the correct function and installation of the device must be checked in accordance with this user manual and other applicable regulations. ® Incorrect installation and operation of the liteServer may lead to a loss of warranty! The functional “Commissioning”...
  • Page 18: Troubleshooting

    Troubleshooting/Remedy Assembly Do not drill holes in the housing visual inspection Do not attach any components not ap- proved by SAMCON to the housing visual inspection transportation, op- Replacement of damaged parts, regular eration Damage to housing, seal, gland...
  • Page 19: Maintenance/ Modification

    All necessary maintenance measures should be initiated and/or executed. Repair Repair must only be carried out with original spare parts of SAMCON Prozessleittechnik GmbH. Damaged pressure-resistant housings must be replaced completely. If in doubt, return the component(s) to SAMCON Prozessleittechnik GmbH.
  • Page 20: Certificates

    Certificates 12.1 EU - Declaration of Conformity Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 20 of 24...
  • Page 21: Eu Type Examination Certificate (Atex)

    12.2 EU Type Examination Certificate (ATEX) http://samcon.eu 12.3 IECEx Certificate of Conformity: http://samcon.eu 12.4 Other certificates http://samcon.eu Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 21 of 24...
  • Page 22 Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 22 of 24...
  • Page 23 Doc.-ID: 220518-PT20BAU-SS-Ex Installation Manual rev.01.docx, Page 23 of 24...
  • Page 24 Schillerstraße 17, 35102 Lohra-Altenvers www.samcon.eu, info@samcon.eu fon: +49 6426 9231-0, fax: - 31...

Table of Contents