UPS-XBP Series Manual Table of Contents Important Safety Instructions...............3 Product Overview and Setup................3 Rear Panel View..........................3 Installation and Setup with UPS......................4 Type of Battery Required................5 Battery Replacement..................5 UPS-XBP-36............................5 UPS-XBP-48............................8 UPS-XBP-72............................10 Wiring Diagram..................12 UPS-XBP-36............................12 UPS-XBP-48............................13 UPS-XBP-72............................14 Storage & Maintenance................15 Storage............................15 Lowell Manufacturing Company | 05-10-18...
UPS-XBP Series Manual Important Safety Instructions Please strictly comply with all warnings and operating instructions in this manual. Save this manual and carefully read the following instructions before installing the unit. Do not operate this unit before carefully reading through all safety information and operating instructions.
UPS-XBP Series Manual Installation and Setup with UPS Unpacking & Inspection 1. Remove the battery box from the packing. Note: The battery box is very heavy, be cautious when unpacking and lifting the unit to avoid injury. 2. Check the inside package Battery box unit •...
UPS-XBP Series Manual Connecting with UPS and Other Battery Box Follow below installation chart to connect with UPS and other battery box with included cable. 1st Battery Pack 2nd Battery Pack Type of Battery Required This battery box has been designed to operate with the following types of batteries:...
Page 6
UPS-XBP Series Manual Step 3: Remove the fixed part of the front panel by removing the 2 screws present. Step 4: Remove the metal top cover of the battery box by unscrewing 6 screws present on the two sides (3 on the right side and 3 on the left side), 3 screws on the top and 4 screws on the back side.
Page 7
UPS-XBP Series Manual Step 6: Now, it is possible to put all batteries inside the unit by following the below picture (the following drawing are indicates the wire fastener positions for the correct battery placement). Note: To install the second string of batteries, repeat the same procedure on the right side of battery box.
UPS-XBP Series Manual UPS-XBP-48 Step 1 : Open the package and place the battery box on a horizontal plane. Step 2: Remove the removable front panel part by pulling it from the lower extremity Step 3: Remove the fixed part of the front panel by removing the 2 screw present.
Page 9
UPS-XBP Series Manual Step 6: Now, it is possible to put all batteries inside the unit by following the below picture (the following drawing are indicates the wire fastener positions for the correct battery placement). Note: To install the second string of batteries, repeat the same procedure on the right side of battery box.
UPS-XBP Series Manual UPS-XBP-72 Step 1 : Open the package and place the battery box on a horizontal plane. Step 2: Remove the removable front panel part by pulling it from the lower extremity Step 3: Remove the fixed part of the front panel by removing 2 screw present.
Page 11
UPS-XBP Series Manual Step 6: Now, it is possible to put the batteries inside following below picture (in the following drawing are indicated the fasten positions for the correct batteries placing). Note: To install the second string of batteries, repeat the same procedure on the right side of battery box.
UPS-XBP Series Manual Wiring Diagram UPS-XBP-36 Picture example as below: 450M 150M 350M 150M 350M 450M Note: The cable connection from the external battery connector to PCB is already present inside the battery box. All the other cable connections should be made in accordance with the above wiring diagram.
UPS-XBP Series Manual P90-BP48 Picture example as below: 260MM 280M 220MM 300MM 280M Note: The cable connection from the external battery connector to PCB is already present inside the battery box. All the other cable connections should be made in accordance with the above wiring diagram.
UPS-XBP Series Manual P90-BP72 Picture example as below: 240M 280M 380M 380M Note: The cable connection from the external battery connector to PCB is already present inside the battery box. All the other cable connections should be made in accordance with the above wiring diagram.
UPS-XBP Series Manual Storage & Maintenance The unit contains no user-serviceable parts. If the battery service life (3~5 years at 25°C ambient temperature) has been exceeded, the batteries must be replaced. In this case, please contact your dealer. Be sure to deliver the spent battery to a recycling facility or ship it to your dealer in the replacement battery packing material.
Need help?
Do you have a question about the UPS-XBP Series and is the answer not in the manual?
Questions and answers