TERMET COMBI BOILER ECOCONDENS CRYSTAL PLUS-50 Instruction Manual

Gas-fired condensing central heating boilers
Table of Contents

Advertisement

Quick Links

INSTRUCTION MANUAL
INSTALLATION, OPERATION
AND MAINTENANCE
Gas-fired condensing
central heating boilers
COMBI BOILERS
EcoCondens Crystal Plus-50
SYSTEM BOILERS
EcoCondens Crystal Plus-50

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the COMBI BOILER ECOCONDENS CRYSTAL PLUS-50 and is the answer not in the manual?

Questions and answers

Summary of Contents for TERMET COMBI BOILER ECOCONDENS CRYSTAL PLUS-50

  • Page 1 INSTRUCTION MANUAL INSTALLATION, OPERATION AND MAINTENANCE Gas-fired condensing central heating boilers COMBI BOILERS EcoCondens Crystal Plus-50 SYSTEM BOILERS EcoCondens Crystal Plus-50...
  • Page 2 EcoCondens Crystal PLUS-50 DEAR CUSTOMER Congratulations on having chosen termet product. We offer you modern, economical and environmentally friendly product, meeting particularly high requirements of European Standards. Please read this instruction manual carefully as the knowledge of service rules and manufacturer’s recommendations are the conditions of reliable, efficient and safe operation of the appliance.
  • Page 3 ISU-718:2020/BO EcoCondens Crystal PLUS-50 WARNING Operational instruction during the start Operational instruction during the start-up of the condensing boilers. up of the condensing boilers. The instruction should be used after every draining water in the boiler The instruction should be used after every draining water in the boiler The instruction should be used after every draining water in the boiler i.e.
  • Page 4: Table Of Contents

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Table of Contents 1. INTRODUCTION ......................................................3 2. BOILER DESCRIPTION ....................................................3 2.1. T ..................................................3 ECHNICAL SPECIFICATION 2.1.1. Technical features..................................................3 2.2. D ............................................ 3 ESIGN AND TECHNICAL SPECIFICATIONS OF THE BOILER 2.2.1. Main units of the boiler................................................3 2.2.2.
  • Page 5: Introduction

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 1. INTRODUCTION Bifunctional condensing gas boiler isdesignedfor supplying central heating systems and for heating domestic water. There are described below mentioned types of ECOCONDENS CRYSTAL PLUS 50 boilers, bifunctional designed for supplying a central heating systems and for heating domestic water in instantaneous water-water heat exchanger: type ECOCONDENS CRYSTAL PLUS 50 and ECOCONDENS CRYSTAL PLUS50 boilers, one function designed for supplying a central heating system and heating domestic water in separately connected water...
  • Page 6 ISU-718:2020/BO EcoCondens Crystal PLUS-50 Rys.2.2.1.2. The elements of the system boilerECOCONDENS CRYSTAL PLUS 50 Boiler control unit Temperature selector of heating water 2. Heating water, domestic water and static pressure temperature display with error codes diagnostic Control panel Temperature selector of domestic hot water Fig.2.2.1.3.
  • Page 7: Technical Data

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 2.2.2.Technical data SYSTEM BOILR COMBI BOILER Parameter Unit ECOCONDENS CRYSTAL PLUS-50 ECOCONDENS CRYSTAL PLUS-50 Size E n e r g e t i c p a r a m e t e r s C e n t r a l h e a t i n g c i r c u i t Boiler thermal power at 80/60 C (modulated) 5,5 ÷...
  • Page 8: Protection Equipment

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 M o u n t i n g d i m e n s i o n s Concentric ∅80/∅125, concentric ∅60/∅100 or 2 single∅80 x ∅80 Connection to the chimney duct (see section 3.8. and table 7.1.) Connection of heating water (CH) and gas cale G3/4...
  • Page 9: Method Of D.h.w. Heating In Combi Boilers

    2.4.4. The way of heating the water in system boilers cooperating with domestic water tank. The boiler may cooperate with all domestic water tanks available in Termet`s offer. Adjustment and display of domestic water temperature are done on the controller of the boiler.
  • Page 10: Regulations Related To The Room

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 3.1.2. Regulations related to the room Requirements for premises where gas appliances are installed shall be in accordance with local regulations.The room where appliance is to be installed should ensure the air supply and venting system necessary for gas combustion in accordance with local regulations.
  • Page 11: Connection To The Gas Installation

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Fig 3.3.2 Installation dimensions of ECOCONDENS CRYSTAL PLUS system boilers 3.4. Connection to the gas installation Connect a gas supply pipe directly to the connector of the boiler gas unit by means of standard connector subassembly. It is necessary to install a gas filter on the gas supply pipe.
  • Page 12: System Cleaning And Water Treatment For The C.h. Filling

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Exhaust ventilation Exhaust ventilation From the water system From the water system Floor drain Floor drain Combi boiler System boiler Fig. 3.5.1 Boilers installation requirements 3.5.1. System cleaning and water treatment for the C.H. filling. Every component of C.H. system is threatened by limestone deposits, corrosion and other dangerous processes. Boiler is the most expensive part of C.H. system and it is necessary to protect its components like heat exchanger and other parts against harmful processes.
  • Page 13: The Ways Of Mounting Adapters (Elbows Connection) To The Boiler Type

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Boilers ECOCONDENS CRYSTAL PLUS belong to B family of boilers which means that they take air for combustion directly from room when they are installed. To ensure proper functioning of the device use the appropriate wire size (diameter, maximum length, resistance on the knees), depending on the combustion system used. The dimensions of the wires should be adequately compatible as given in table.
  • Page 14: Vertical Outlet Of Air- Flue Gas System Through The Roof

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Coaxial elbow 90° 3.8. Coaxial T-piece 90° with revision 3.Ve rtica m ax outl et of air- flue 60/100 syst thro roof Adapter Tabl 3.8. 3.1. The coaxial system ∅80/∅125 Boilertype ECOCONDENS CRYSTAL PLUS-50 Maximum length of flue L =12 m The coaxial system ∅60/∅100 Boilertype...
  • Page 15: Flue Gas Air Outlet And Air Inlet Brought By Two Separate Tubes

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 3.8.5. Flue gas air outlet and air inlet brought by two separate tubes To apply the two-pipe system should: • Unscrew the top cover of the combustion chamber at point of connection of the air supply system to the boiler •...
  • Page 16: Connection Of A Room Temperature Control Unit

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 3.9.2. Connection of a room temperature control unit 3.9.2.1. Room regulator with contact. The boiler has been designed to cooperate with a room temperature control unit which has got its own supply source and control contact free from potential. Connections must be made according to the instructions of regulator manufacturer.
  • Page 17: Adjusting The Boiler To Combust Another Type Of Gas

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 4.2. Adjusting the boiler to combust another type of gas The boiler can be adjusted to combust another type of gas but only for this one which the boiler is certified for. The types of gases are given on the rating plate - in the index designation: Categories II 2E3B/P...
  • Page 18: Boiler Adjustment With A Gas Analyzer

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 4.3.2. Boiler adjustment with a gas analyzer Adjustment for 20kW boilers Minimum poweradjustment Maximum poweradjustment • • Check the set speed (parameter P25) and compare with table 4.3.2.1. Check the set speed (parameter P24) and compare with table 4.3.2.1. •...
  • Page 19: Service Parametersmode

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 rpm x 50 Max. fan speed (natural gas) (rpm x 10) (530) (530) rpm x 50 Max. fan speed (liquefied gas) According to (rpm x 10) (650) (650) Table: rpm x 50 Min. fan speed (natural gas) 4.3.2.1 (rpm x 10) (125)
  • Page 20: Fan Characteristics

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Table 4.4.2.1. List of parameters in information mode Paramet ernumber Descri ption Value Suppl y temperature sensor (°C) 00 ÷ 125 Return temperature s ens or (°C ) 00 ÷ 125 DHW temperature s ensor (°C ) – f low, t ank , top o f the t ank 00 ÷...
  • Page 21: Meaning Of Buttons On The Control Panel

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 The turning on of the boiler in the heating season • Set the desired temperature of the heating water using buttons K1-K2 in the range of 20° C to 80° C • The spark generator will cause ignition of gas outflowing from the burner. •...
  • Page 22: Signalization Of Operationstates

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 During this operation, the heat demand is inactive and the The function is always activated in the case of: fan operates at its highest speed for 120 seconds. - Disconnection and reconnection to the power The pump is switched on and off alternately for periods of source.
  • Page 23 ISU-718:2020/BO EcoCondens Crystal PLUS-50 Flame circuit damage: Manual orremote reset A flame was detected outside the safety limits, posing a risk to the electronics of the boiler. Boileroperationisstopped. Check valve error: Boiler is not equipped with valve. Error should not occur. Valve does not respond to controller requests.
  • Page 24: Boilershutdown / Standbymode

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 5.3.3.4. History deletion mode Back data deletion procedure: • Hold the K4 button for 10 seconds. The inscription "tS" appears. • Press the K7 button three times, the inscription "rES" appears. • Press and hold the K5 button for at least 5 seconds. As confirmation of this operation, controller will automatically exit the installer mode.
  • Page 25 ISU-718:2020/BO EcoCondens Crystal PLUS-50...
  • Page 26: Checking The Temperature Sensors (Table 6.1.5.1.)

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 6.1.5. Checking the temperature sensors (Table 6.1.5.1.) (Table 6.1.5.1.) - NTC sensor of CH water, DHW. and central heating-return return NTC (DHW) and NTC (CH) sensor resistance, NTC tank NTC (DHW) and NTC (CH) sensor resistance, NTC tank •...
  • Page 27: The Maintenance Operations To Be Performed By The User

    ISU-718:2020/BO EcoCondens Crystal PLUS-50 Fig. 6.2.1 – Electrical diagram for system boilers Fig. 6.2.2 – Electrical diagram for combi boilers Common 6.3. The maintenance operations to be performed by the user User should: • clean the water filter periodically, preferably before the heating season (should be replaced when used), •...
  • Page 28 ISU-718:2020/BO EcoCondens Crystal PLUS-50 Table 7.1 Drawing number Name Type INDEX Quantity Refers tothe boiler Remarks Code Hook for wood 8 x 70 Sparing sleeve ECOCONDENS CRYSTAL PLUS Self-tapping screw ST4.2 x 9.5-C-Z PN-EN ISO 7049 Self-tapping screw ST3.5 x6.5-F-H In boiler ECOCONDENS CRYSTAL 3-way valve...
  • Page 29 Długa 13, 58-160 Świebodzice, Poland Export Department tel. 74 856 06 75, 74 854 68 90 http:// www.termet.com.pl termet@termet.com.pl export@termet.com.pl...

This manual is also suitable for:

System boiler ecocondens crystal plus-50

Table of Contents