MACHINE COMPONENTS

The Arena-VatorII consists of a cultivator as-
sembly up front, a leveling blade and a rear
roller. It will work the soil, level it, pack and
condition the surface in one pass.
A
CULTIVATOR FRAME
B
REVERSIBLE POINTS/SHOVELS
C
TINES
D
LEVELING BLADE
E
ROLLER
F
HEIGHT ADJUSTMENT ARM
4.3

MACHINE BREAK-IN

Although there are no operational restrictions on
the Arena-VatorII when used for the fi rst time,
it is recommended that the following mechanical
items be checked:
A. After Operating For 1 and 5 Hours:
1. Check all nuts, bolts and other fasteners.
Tighten to their specifi ed torque level.
2. Check that the tines are in good
condition.
3. Then go to the regular service schedule as
defi ned in Section 5.
11
Fig. 1 - Machine Components
4.4

PRE-OPERATION CHECKLIST

Effi cient and safe operation of the Arena-VatorII
requires that each operator reads and under-
stands the operating procedures and all related
safety precautions outlined in this section. A
pre-operation checklist is provided for the opera-
tor. It is important for both the personal safety
and maintaining the good mechanical condition
of the Arena-VatorII that this checklist is fol-
lowed.
Before operating the machine and each time
thereafter, the following areas should be checked
off:
Use only a small Agricultural tractor of the
recommended horsepower on the machine.
Check that the machine is properly
attached to the tractor. Be sure retainers
are used on the mounting pins.
Be sure extra weights are mounted on the
front of the tractor if required.
Check the tines/shovels/blade/roller. Be
sure they are not damaged or broken and
are not badly worn. Repair or replace as
required.
Check for entangled material. Remove this
material.