INSTALLATION INSTRUCTIONS
The radiator can be installed in three different heating configurations; connected to a central heating
system, fitted with a summer electric heating kit as an electric radiator, or as a dual source connected
to a central heating system and with a summer electric heating kit fitted.
PLEASE NOTE: THE TRAFALGAR AND BLOOMSBURY RADIATORS ARE MADE FROM STEEL AND
WHEN CONNECTED TO CENTRAL HEATING SYSTEMS SHOULD ONLY BE USED ON CLOSED SYSTEMS
CONTAINING A RUST INHIBITOR.
- review instructions carefully before installation
- installation should be completed by a suitably qualified person
- please dispose of packaging in a responsible manner
POSITION:
The radiator, if intended to be heated with the summer electric heating kit, can be installed in the Zone 2
area (see Fig below), but the electrical connection box must be outside the Zone 2 area.
Zone 1
Zone 2
60cm
Zone 0
(1) Side view, bath
PLEASE NOTE:
● This product can only be used at PN≤1MPa (10Kg/cm, 10Bar). It should only be filled with a water
mixture containing a rust inhibitor, and at a temperature below 100°C (or 212°F). See table below
for installation requirements.
● If the temperature exceeds 48°C (or 120°F), please install a warning sign near the product to avoid
burning or scalding accidents.
● If the product is not used for a period during which ambient temperature drops below 5°C (or 41°F),
please drain the water out of the radiator to avoid oxidization.
● For prolonged usage and safe operation please check product at regular intervals.
Water mixture
containing a
rust inhibitor
AFTER CARE ...
The Trafalgar and Bloomsbury radiators are made from steel with chrome plating, and should not be
cleaned with corrosive or scouring cleaning agents.
Zone 1
Zone 0
Zone 1
(2) Top view
0°C ≤t≤100°C
60cm
Zone 2
60cm
1 - 5
Trafalgar
R1 CHR
Bloomsbury
R2 CHR
Zone 1
Zone 2
60cm
Zone 0
(3) Side view, shower
°C
E

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Trafalgar R1 CHR and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Burlington Trafalgar R1 CHR

  • Page 1 Trafalgar R1 CHR Bloomsbury R2 CHR INSTALLATION INSTRUCTIONS The radiator can be installed in three different heating configurations; connected to a central heating system, fitted with a summer electric heating kit as an electric radiator, or as a dual source connected to a central heating system and with a summer electric heating kit fitted.
  • Page 2 Tools required: Ø8mm Installation position is determined by installer. Parts supplied: ST4.8 * 45mm Ø8mm 2 - 5...
  • Page 3 Heated with the central heating system Parts required: The diagrams of control valve and the connecting pipe as shown above are for reference only, and should be purchased separately. After installation ... ● Use a screwdriver to open the air vent, open the inlet valve and let the water rush into the radiator.
  • Page 4 Heated with the summer electric heating kit only Parts required: The diagram of the summer electric heating kit as shown above is for reference only, and can be purchased separately. If the radiator is to be used for electric heating only ( not connected to a central heating system ), then seal the bottom inlet / outlet nipples with the blanking plugs.
  • Page 5 Dual source connect to central heating system and with a summer electric heating kit Parts required: The diagrams of control valve, the connecting pipe and the summer electric heating kit as shown above are for reference only, and should be purchased separately. Connect to the electric supply via a fused spur.
  • Page 6 Summer Electric Heating Kit (150W for Cleaver & Berkeley & Vincent) R8 CHR Summer Electric Heating Kit (250W for Bloomsbury) R9 CHR Summer Electric Heating Kit (400W for Trafalgar) R10 CHR This summer electric heating kit allows you the benefit of heat from your bathroom radiator on cooler days without the need to run your complete central heating system.
  • Page 7 d) Switch off the heating element at the supply when not in use. e) Do not operate the heating element when there is no water in the radiator. It incorporates an overheat protection thermal fuse which may blow if this occurs. f) If the mains supply cable to the heating element becomes damaged it must be replaced by the manufacturer, its service agent or a similarly qualified person in order to avoid a hazard.

This manual is also suitable for:

Bloomsbury r2 chrR8 chrR9 chrR10 chr

Table of Contents