Advertisement

Quick Links

HBCA-3.6-5
HBCA-4.6-5
HBCA-5-5
HBCA-6-5
UHOO USER MANUAL
HBCA-3.6-10
HBCA-4.6-10
HBCA-5-10
HBCA-6-10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the UHOO HBCA-3.6-5 and is the answer not in the manual?

Questions and answers

Summary of Contents for SEMOOKII UHOO HBCA-3.6-5

  • Page 1 HBCA-3.6-5 HBCA-3.6-10 HBCA-4.6-5 HBCA-4.6-10 HBCA-5-5 HBCA-5-10 HBCA-6-5 HBCA-6-10 UHOO USER MANUAL...
  • Page 2: Table Of Contents

    CONTENTS 1. GENERAL INTRODUCTION -------------------------------------------------------------- 4 1.1 System Introduction ------------------------------------------------------------------- 4 1.2 Safety Introduction ------------------------------------------------------------------- 4 1.3 Packing List -------------------------------------------------------------------------- 6 1.4 System Appearance ------------------------------------------------------------------- 8 1.5 Liability Limitation ------------------------------------------------------------------- 11 2. INSTALLATION ----------------------------------------------------------------------- 12 2.1 Installation Site and Environment ------------------------------------------------------- 12 2.2 Installation Steps -------------------------------------------------------------------- 14 2.3 Cable Connection -------------------------------------------------------------------- 21 2.4 DERD Connection ------------------------------------------------------------------- 30...
  • Page 3 Copyright Statement This manual is under the copyright of SEMOOKii BESS CO., LTD. (here in after referred to as SEMOOKii), with all rights reserved. Please keep the manual properly and operate in strict accordance with all safety and operating instructions in this manual. Please do not operate the system before reading through the manual...
  • Page 4: General Introduction

    1. GENERAL INTRODUCTION 1.1 System Introduction UHOO series hybrid all-in-one battery energy storage system (BESS) is designed for both indoor and outdoor use. BESS can store the DC power generated by the PV array into the battery, or convert it into AC power to loads. This user manual applies to the following products: HBCA-3.6-5/HBCA-3.6-10/HBCA-4.6-5/HBCA-4.6-10/HBCA-5-5/HBCA-5-10/HBCA-6-5/HBCA-6-10.
  • Page 5 Usage and operation of the BESS must follow instructions in this user manual, otherwise the protection design might be useless and warranty for the BESS will be invalid. Do not open BESS cover or change any component without SEMOOKii authorization, otherwise the warranty commitment for the BESS will be invalid.
  • Page 6: Packing List

    1.3 Packing List HBCA-3.6-5/HBCA-4.6-5/HBCA-5-5/HBCA-6-5 Terminal Document 2 x upper and lower 1 x WiFi module accessory accessory connection plate 1 x Meter (Three 1 x Quick Phase Meter/ Installation Label accessory 8 x M4*10 1 x M4*10 (PE) Single Phase Manual Meter) 2 x φ10*60...
  • Page 7 HBCA-3.6-10/HBCA-4.6-10/HBCA-5-10/HBCA-6-10 Terminal Document 2 x upper and lower 1 x WiFi module 2 x cables accessory accessory connection plate 1 x Meter (Three 1 x Quick Phase Meter/ Installation Label accessory 16 x M4*10 1 x M4*10 (PE) Single Phase Manual Meter) Disassemble...
  • Page 8: System Appearance

    1.4 System Appearance Item Description Energy Indicator lamp Status Indicator lamp Logo Battery box * * Two battery boxes can be placed. LED INDICATORS STATUS LED INDICATORS Waiting Blue LED blinking, with an interval of 1sec Blue LED blinking, with an interval of 0.5sec Checking Normal Blue LED on...
  • Page 9 Terminals of BESS: Page 9 / 48...
  • Page 10 Item Description Tool requirements and torque Grid output & EPS output Cross screwdriver 2.5 Nm WiFi port Plug and play terminals no tool required VPP communication port Flat head screwdriver USB port for upgrading Plug and play terminals no tool required Meter communication port &...
  • Page 11: Liability Limitation

    1.5 Liability Limitation SEMOOKii does not assume any direct or indirect liability for any product damage or property loss caused by the following conditions:  Product modified, design changed or parts replaced without SEMOOKii authorization;  Changes, or attempted repairs and erasing of series number or seals by non SEMOOKii technician;...
  • Page 12: Installation

    2. INSTALLATION It is required to be installed on a flat ground or platform which can bear at least 300kg. The back of the battery box requires a wall or bracket that can fix expansion bolts, bearing at least 300kg. The installation site is required to be free from and has no flammable and explosive items and maintains air circulation.
  • Page 13 2.1.4 Select Mounting Location For the BESS's protection and convenient maintenance, mounting location for The BESS should be selected carefully based on the following rules: Rule 1. The BESS should be installed on a solid surface, where is suitable for inverter's dimensions and weight. Rule 2.
  • Page 14: Installation Steps

    2.2 Installation Steps Unpacking the battery box and inverter box. Unpacking the battery box Unpacking the inverter box 2.2.1 Battery Box Installation Page 14 / 48...
  • Page 15 For 10kWh BESS: Step 1: Paste the cushions of the battery box. Find four cushions from the inverter packaging accessory and paste them at the four corners of the bottom of the battery box. Step 2: Back plate pre-tightening Remove the installation back plate from the inverter attachment package and pre-tighten the back plate to the top of the battery box with two M4*10 screws, as shown in the figure below: Step 3: Drilling holes...
  • Page 16 Step 5: Fix battery box and back plate Rotate the back plate in place and spin the expansion pipe into the locking back plate with self-tapping screws (note that the battery box is fixed with the back plate). Replace the battery box and align the expansion pipe with the backboard hole, and then spin the self-tapping screws into it until the screw plane is pressed on the back plate.
  • Page 17 Step 8: Drilling holes Put the pre-installed battery box in a specified position, so that it is close to the fixture, mark it according to the hole position on the back plate, then rotate the back plate at an angle (or take the backboard away), and drill holes at the fixture withφ10mm.
  • Page 18 How to fine-tune the battery box: Item Name Torque Note Expansion screws 4 Nm Tune up and down Tune screws 3 Nm Tune left and right Fix screws 3 Nm Tune front and back Step 11: Fix the upper and lower connection plate. (Torque 2.5 Nm) Page 18 / 48...
  • Page 19 2.2.2 Inverter Box Installation Step 1: Take the inverter out of the box and place it smoothly on the battery box. Be careful not to damage the cables of the inverter when moving it. Step 2: Fix the upper and lower connection board to the inverter box Pre-lock the back plate and inverter with M4*10L stainless steel screws, then lock the battery box and inverter with a upper and lower connection plate, and finally lock the back plate with the screws of the inverter.
  • Page 20 Step 3: Install WiFi module Find the WiFi module in the accessory package and insert it into the base, then tighten the Plastic nut. Torque: 2.5N.m. Page 20 / 48...
  • Page 21: Cable Connection

    2.3 Cable Connection 2.3.1 General Make sure all the switches and breakers on the BESS are turned off. Note: For Australia and New Zealand the PV SWITCH is not integrated. Note: The external isolation devices for PV array ports shall include the requirement of an additional external break switching device that conforms to the requirements AS/NZS 4777.1.
  • Page 22 For 10kWh BESS: Make sure all the switches and breakers on the BESS are turned off. Step 1: Untie the cable ties. Step 2: First open the waterproof cover of the corresponding terminal, and insert the responding terminal in turn according to the cable label.
  • Page 23 Step 3: Connect the cables between two battery boxes. Find the WiFi module in the accessory package and insert it into the base, then tighten the Plastic nut. Torque: 2.5 N.m. Step 4: Connect the cables between two battery boxes. Open the communication cover plate and wiring according to the print instructions on the communication cover board.
  • Page 24 Step 5: Connect the cables between two battery boxes Open the waterproof cover plate and connect according to the type description on the box. Open the press nut of the waterproof joint and pull out the seal race. Then penetrate the wire into the hole. Note: The length of the cable shall be less than 30 meters.
  • Page 25 Fix the waterproof cover and lock it. Note: Declaration for back-up function:  Some external factors may cause the back-up switching time more than 10 ms, so do not connect loads that depend on a stable energy supply for a reliable operation. ...
  • Page 26 Step 7: Connect PV cables 1. Press the terminal; 2. Plug through the terminal and lock the nut; Grade Description Value Outside Diameter 5.5-8.0mm Conduct Wire Length Conduct Core Section 4-6mm 3. Finish the interpolation. Page 26 / 48...
  • Page 27 2.3.3 System Wiring Please select breaker according to the specification below: Three Phase Meter Single Phase Meter Page 27 / 48...
  • Page 28 Choose the proper breaker: ① ② ③④ Model HBCA-3.6-5/10 50A/230V AC breaker 32A/230V AC breaker HBCA-4.6-5/10 63A/230V AC breaker 32A/230V AC breaker Depends on household loads (usually already placed in the grid distribution box) HBCA-5-5/10 63A/230V AC breaker 32A/230V AC breaker HBCA-6-5/10 63A/230V AC breaker 40A/230V AC breaker...
  • Page 29 Note: The back-up PE line and rack earth must be grounded properly and effectively. Otherwise the back-up function may be abnormal when the grid fail. 2.3.4 Power Meter The electricity meter should be mounted and connected at the grid transition point so that it can measure the grid reference and feed-in power.
  • Page 30: Derd Connection

    2.4 DERD Connection DRED is used for Australia and New Zealand installation to support several demand response modes. Demond response mode Requirement Disconnected DRM0 Import power = 0 & Generate power = 0 DRM1 Import power = 0 DRM2 Import power < 50% DRM3 Import power <...
  • Page 31  DRED Wire connection Open the communication cover plate and wiring according to the print instructions on the communication cover board. Open the press nut of the waterproof connector, pull out the seal race, then penetrate the conductor into the hole, connect the corresponding label in turn, then tighten the forced nut, and finally lock the waterproof cover plate.
  • Page 32: System Operation

    3. SYSTEM OPERATION 3.1 Switch On Warning: Please check the installation again before turning on the system. Step 1: Turn on the battery switch on every battery module. Note: The battery switch isolates the internal battery modules which are connected in series, the battery switch should not be used to disconnect the batteries under load.
  • Page 33 Step 3: Turn on the PV switch. Note: For Australia and New Zealand the PV SWITCH is not integrated. Note: The external isolation devices for PV array ports shall include the requirement of an additional external break switching device that conforms to the requirements AS/NZS 4777.1 Step 4: Turn on the grid breaker.
  • Page 34: Switch Off

    When the WH-SPHA battery energy storage system (BESS) appears to be running abnormally, you can turn off the main grid breaker that directly feeding the BESS, and turn off all switches within the BESS. Then please contact SEMOOKii Pro and we will provide detailed instructions. 3.3.2 First Aid Measures If battery module leaks electrolyte, avoid contacting with the leaking liquid or gas.
  • Page 35: Enest Configuration

    4. ENEST CONFIGURATION This part shows Enest configuration step by step. 4.1 Preparation 1. Inverter must be powered up with only PV power. 2. Need a router with available Internet access to the Enest application center. 3. An Android or iOS smart phone. Step 1: If backup load is applied, turn off the backup load first, and then turn off the...
  • Page 36: Wi-Fi Stick Pairing

    4.2 Wi-Fi Stick Pairing NOTE: 1. The pairing process must be completed within 3 minutes once the Wi-Fi stick is powered on. 2. Network configuration need you to allow Bluetooth permission. 3. If configuration fails, please unplug the Wi-Fi stick and reconfigure after 10 seconds. 4.
  • Page 37 Step 3: Enter your Wi-Fi name and password and click “Confirm” to start pairing (red light blinking). You can click the “switch” button to select other Wi-Fi. Step 4: Please be patient during network configuration and pairing process. It will enter the Enest home screen after paired.
  • Page 38 Step 5: If configuration fails, please unplug the Wi-Fi stick, then plug into the device port again and reconfigure after 10 seconds. Step 6: Please connect to the network (Password: 12345678) on the WLAN setting page, then back to Enest. Page 38 / 48...
  • Page 39 Step 7: Enter your Wi-Fi name and password on the network configuration screen and click “Connect” to start pairing. Step 8: Please be patient during network configuration and pairing process. It will enter the Enest home screen after paired. Please wait for the data to be uploaded because the newly paired device may display offline status.
  • Page 40 Add More Device Step 1: Click on the device name at the top of the home page, expand the device list, then click “+” to scan QR code of Wi-Fi stick. Step 2: Go to settings, click “Device Management” then click “+” to scan QR code.
  • Page 41: Install Side Plate

    4.3 Install Side Plate Confirm that the left and right side plates are installed respectively after the BESS is working properly. Page 41 / 48...
  • Page 42: Ems Configurations

    5. EMS CONFIGURATIONS Energy management system (EMS) configurations can be done via Enest App. Three working modes can be set: l. Self-Powered: Enest will manage your family power to reduce buying power from power grid. 2. Load Shifting Power from battery will be charge and discharged as you configured. 3.
  • Page 43: Cleaning And Maintenance

    6. Cleaning and Maintenance Power off the system first. ● Shutdown procedure: Step 1: If backup load is applied, turn off the backup load first, and then turn off the backup breaker. Step 2: Turn off the grid breaker. Step 3: Turn off the PV switch. Step 4: Open the battery breaker cover and turn off the battery breaker.
  • Page 44: Annex

    7. ANNEX 7.1 Datasheet All-In-One Spec. Series name: UHOO HBCA-3.6-5 HBCA-4.6-5 HBCA-5-5 HBCA-6-5 Model HBCA-3.6-10 HBCA-4.6-10 HBCA-5-10 HBCA-6-10 PV Input Absolute max Voltage [d.c.V] MPPT Voltage Range [d.c.V] 100...550 Max. DC Input Power [W] 4800 6200 6650 8000 Start-up Voltage [d.c.V] Rated Operating Voltage [d.c.V] Max.
  • Page 45 All-In-One Spec. Series name: UHOO HBCA-3.6-5 HBCA-4.6-5 HBCA-5-5 HBCA-6-5 Model HBCA-3.6-10 HBCA-4.6-10 HBCA-5-10 HBCA-6-10 AC input power factor -0.8...+0.8 AC output power factor 1 (-0.8...+0.8 adjustable) THDi < 3% EPS Output (With Battery) Max. Output Power [W] 3600 4600 5000 6000 Rated Apparent Power [VA] 4320...
  • Page 46 All-In-One Spec. Series name: UHOO HBCA-3.6-5 HBCA-4.6-5 HBCA-5-5 HBCA-6-5 Model HBCA-3.6-10 HBCA-4.6-10 HBCA-5-10 HBCA-6-10 General Data MF20425 MF40925 Dimension (W/D/H) [mm] 550*233*1125 550*233*1750 Dimension of Packing (W/D/H) [mm] 645*302*1370 655*302*2055 Net weight [kg] Gross weight [kg] Operation Temp [° C] -10...
  • Page 47: Labels

    8. LABELS 8.1 Inverter label Page 47 / 48...
  • Page 48: Battery Label

    8.2 Battery label Page 48 / 48...

Table of Contents