Phoenix Advertising Pvt. Ltd. Exide Integra/HUPS/Manual/001 Date: 22.02.2022 USER MANUAL & WARRANTY CARD PURE SINE W A VE LI - ION BA TTERY BASED INVERTER For any Service related issue call : Exide Industries Ltd. 59E, Chowringhee Road, Kolkata – 700 020...
Automatic Protection Control e.g. Overload, Battery Low, CONNECTION PANEL: Heat-up & Short Circuit EXIDE INTEGRA Pure Sine Wave Inverter has a 3-Way Terminal Block, Power Supply Elegant Wall Hanging Design ON/ OFF Switch, Thermal Circuit Breaker, and Earthing Connection point.
Before installing, connecting any wiring or using the EXIDE INTEGRA, read all Important Precautions: instructions of this instruction manual. The Output Side of the AC supply wiring of EXIDE INTEGRA should never be CAUTION: connected to utility Power or DG Set. This condition is far worse than Short Do not install unit unless instructed to do so.
Never attempt to charge a frozen battery. Rated Capacity 563VA/450W 900VA/720W Never applied any kind of liquid or re on EXIDE INTEGRA Inverter Max. Charging Current 5Amp ± 0.5Amp 8Amp ± 0.5Amp Before touching any wire makes sure the EXIDE INTEGRA Inverter ...
The system should be installed in a location that meets the following requirements: and in the proper terminals. a) Dry – Do not allow to water to drip or splash on the EXIDE INTEGRA 1. Check to see that the EXIDE INTEGRA Inverter is turned ON by touching b) Cool –...
Step 4: Increase & Decrease the Minutes by touching of ON/ OFF & Backlight Switch respectively Integrated Li-Ion inverter, EXIDE INTGERA is warranted for a Product Warranty of 5 Step 5: After set-up of Hours & Minutes, do not touch any switch until below display...
Page 7
should accompany the Exide Integra if service under warranty period is required to be carried out by Exide or it’s authorized dealer or authorized service center. Any unauthorized accessories connected to the system will not be cover under ...
Page 8
Exide Industries Limited. The decision whether to repair or replace the battery shall be taken by Exide Industries Limited. In the event of any particular battery model being phased...