  • Page 1 PostMount 6-A for XL Panels Code-Compliant Planning and Installation Guide V 2.0 Complying with AS/NZS 1170.2: 2021 Last Updated - Mar. 2023...
  • Page 2 Installation Guide / PostMount 6-A for XL Panels Introduction Clenergy PVezRack® PostMount 6-A for XL Panels (up to 2100 x 1100 mm) is a ground mounting system suitable List of contents for large scale commercial and utility scale installations. PVezRack ® PostMount 6-A for XL Panels has been...
  • Page 3 Installation Guide / PostMount 6-A for XL Panels Tools and Components Tools String & Marker Pen Allen Key Spanner Torque Wrench Tape 6 mm Components Anchoring Kit Mixing Nozzles C-U/30/46-G ER-R-ECO/XXXX ER-AP-PM6/8/A-LP ER-RT-100/2200 ER-RT-70/3170 Universal Clamp x 4 ECO-Rail x 6...
  • Page 4 8. PM6-A Kit Side view drawing of PVezRack® PostMount 6-A for XL Panels is shown below. The panels tilt angle and embedment depth below are for reference only. Please refer to Certificate Letter to obatin the certified max panels tilt angle and min embedment depth for different wind regions and different soil types.
  • Page 5 Installation Guide / PostMount 6-A for XL Panels Precautionary Measures for Stainless-Steel Fastener Installation Precautionary Measures for Stainless-Steel Fastener Installation Improper operation may lead to the deadlock of bolts and nuts. Follow the steps below to reduce this risk. Reduce the friction coefficient (1) Ensure that the thread surface is clean (no dirt or contaminant).
  • Page 6 Panels is to be optimized to suit specific conditions for each project and documented in engineering drawings. As a result, major components of the PVezRack® PostMount 6-A for XL Panels may be provided in sectional sizes and lengths that vary from those shown in this guide. The installation operations detailed in this instruction guide remain the same regardless of the component size.
  • Page 7 Installation Guide / PostMount 6-A for XL Panels Installation Instruction Pipe Installation Dig a hole with the diameter of 300mm . Place the pole into the middle of the hole and fill it with concrete (min 25 MPa strength). Maintain the position of the post.
  • Page 8 Installation Guide / PostMount 6-A for XL Panels PM6-A Rectangular Tube-Master Installation Fix the Rectangular Tube-Master at Steel Cap Assembly with M20*160 hex bolt, M20 nut, plain washer 20, and spring washer 20. See the mark (1). Fix the Adjustable Tube at Rectangular Tube-Master with M20*160 hex bolt, plain washer 20, and spring washer 20, M20 nut.
  • Page 9 Installation Guide / PostMount 6-A for XL Panels Rectangular Tube- Landscape Installation Fix the 3 pcs PM6-A Rectangular Tube-Landscapes at Rectangular Tube-Master on pre-welded L profile angle bracket with 2 pcs M12*100 hex bolts, 2 pcs M12 nuts , 2 pcs plain washers 12 and 2 pcs spring washers 12. Do not fasten the Nut until 3 Rectangular Tube-Landscapes aligned.
  • Page 10 Installation Guide / PostMount 6-A for XL Panels PV Module Installation Fix the PV panel to Rail, via Universal Inter Clamps and End Clamps step by step until all the panels complete. Recommended torque for M8 bolts is 18~20 N·m...
  • Page 11 Installation Guide / PostMount 6-A for XL Panels There are three solutions for Grounding Lug installation. Solution 1: Fix the Grounding Lug at the end of Rail as shown in the figure on the right. Solution 2: Fix the Grounding Lug at the Rail where just under the PV Module as shown in the figure on the right.
  • Page 12 Installation Guide / PostMount 6-A for XL Panels Certification - Certification - Code-Compliant Planning and Installation Guide V 2.0 - Complying with AS/NZS1170.2-2021...
  • Page 13 Installation Guide / PostMount 6-A for XL Panels - Certification - Code-Compliant Planning and Installation Guide V 2.0 - Complying with AS/NZS1170.2-2021...
  • Page 14 Installation Guide / PostMount 6-A for XL Panels - Certification - Code-Compliant Planning and Installation Guide V 2.0 - Complying with AS/NZS1170.2-2021...
  • Page 15 Installation Guide / PostMount 6-A for XL Panels - Certification - Code-Compliant Planning and Installation Guide V 2.0 - Complying with AS/NZS1170.2-2021...
  • Page 16 Installation Guide / PostMount 6-A for XL Panels - Certification - - Certification - Code-Compliant Planning and Installation Guide V 2.0 - Complying with AS/NZS1170.2-2021...
  • Page 17 Installation Guide / PostMount 6-A for XL Panels - Certification - Code-Compliant Planning and Installation Guide V 2.0 - Complying with AS/NZS1170.2-2021...