On Grid SPP system uses the AC (alternating current) system output, Medium Voltage Network (MVN) and Low Voltage Network (LVN). Components Introduction • Solar Module MODENA SL 450 W...
Page 4
• Solar MicroInverter • After reading this manual book, make sure to keep it where the user can find it anytime.
PART 2: INSTALLATION The scope of, installation, activities includes the installation and construction of solar modules, electronic rooms, quard rooms/offices, cable networks and home Installations. The following sections describe the detailed planning of each PV mini-grid component and sub-system and installation instructions. General Explanation On grid SPP system which has been described above consists of the main components which include:...
Page 6
Inverter The inverter used is a Hybrid inverter (DC/AC). The inverter work automatically and there is no need to ON/OFF manually. The inverte will supply AC power to the distribution panel, then it will be distributed to the network. Disconnector It is a switch that functions to connect and disconnect the inverter voltage.
Page 7
The cable that will be installed in the On Grid SPP system must be adjusted to the voltage capacity and the amount of current to be flowed. This needs to be done to avoid energy losses and maintain electrical safety. Solar Module Circuit ▪...
PART 3: HOW TO USE Operating Instructions The electrical energy produced by On Grid SPP is limited by the capacity of the available solar modules, so there needs to be a limiter for electricity consumption or a kWh/VAh limiter. The advantages of this tool are: 1.
5. The MCCB on the distribution panel can be used to disconnect or connect the inverter with the JTR. The MCCB needs to be lowered if a temporary disconnection to JTR is required for reasons of maintenance or repair. 6. The fuse in the customer's house is needed to prevent the lights or consumer electronic equipment from being damaged in the event of a power surge, because the fuse will break first.
Page 10
4. Normal Operation Procedure When turning on the system, the first step that must be considered is to raise the DC Cam switch to the ON position then position the DC Breaker to ON then the inverter will turn on. In the morning before the radiation has not provided enough energy to meet the electricity demand, the sun's intensity will slowly increase, until a time when the entire electrical load can be fully supplied by photovoltaics.
PART 4: MAINTENANCE On Grid SPP systems are carefully designed to work well in uncertain natural conditions and minimal need for maintenance. However, proper, and programmed inspection and maintenance will greatly determine the operational reliability of this On-grid PLTS system and increase the economic and social value of the community.
Page 12
Inverter Maintenance Before doing any work on the inverter, all DC connections from photovoltaic (through the MCB on the MCB module box), cam switch DC battery must first be disconnected and wait a while (minimum 5 minutes) to allow the capacitor to discharge static charge.
PART 5: SPECIFICATION Model SL 450 WP Cell Type Monocrystalline PERC 166*183 mm Number of Cells 144 (6 x 24) Maximum Power (Pmax) 450 W Open Circuit Voltage (Voc) 50.2 V Short Circuit Current (Isc) 11.28 A Voltage at Maximum Power (Vmp) 41.8 V Current at Maximum Power (Imp) 10.77 A Module Efficiency...
Page 14
02/21 PT MODENA INDONESIA Jl. Industri Raya I Blok D-8, Jatiuwung, Tangerang 15135...
Need help?
Do you have a question about the SolarPad SL OGD Series and is the answer not in the manual?
Questions and answers