Advertisement

Quick Links

ASSEMBLY INSTRUCTIONS
PART FL
Date:
2017-03-01
AB Edsbyverken, Box 300, SE-828 25 Edsbyn
Nr:
Tel/Phone +46 (0)271-27500, Fax +46 (0)271-27501
00530211-B
www.edsbyn.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the FL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Edsyn FL

  • Page 1 ASSEMBLY INSTRUCTIONS PART FL Date: 2017-03-01 AB Edsbyverken, Box 300, SE-828 25 Edsbyn Tel/Phone +46 (0)271-27500, Fax +46 (0)271-27501 00530211-B www.edsbyn.com...
  • Page 2 Appliance bag 61167423 should be used. Put out the middle frames, assemble the plinth gable on the middle frame with screw M6x16. Put the complete leg frame on the bottom, first screw on the plinth gables with screw 5,0x45 in the predrilled holes, then use screw 4,5x25 in the small mounting rings on the middle frame.
  • Page 3 Cut off a small corner of the bag with glue (Note: Keep in mind that the glue is very fluid). Apply glue in the slot on the bottom and in the slot on the backs as illustrated. One end stop in each end of the rail. Two trolleys in each rail, should be turned according to picture. Put the board on and lock it with the worm screws.
  • Page 4 Start with a loose shelf in the ninth hole from the bottom, then a fixed shelf in the 20th hole. (One shelf in each back joint). Lock the shelves. Fixed shelf should be screwed on with system screw FX 6,3x10 Fzb. Assemble pot adapter with Assemble the handles with screw 4,0 x 16 fzb pz.

Table of Contents