Sola HD SDU 24-BAT Instruction Manual

Battery module

Advertisement

Quick Links

Battery Module
SDU 24-BAT
Instruction Manual
Clearwater Tech - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.clrwtr.com - Email: info@clrwtr.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SDU 24-BAT and is the answer not in the manual?

Questions and answers

Summary of Contents for Sola HD SDU 24-BAT

  • Page 1 Battery Module SDU 24-BAT Instruction Manual Clearwater Tech - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.clrwtr.com - Email: info@clrwtr.com...
  • Page 2 While every precaution has been taken to ensure accuracy and completeness in this manual, SolaHD assumes no responsibility, and disclaims all liability for damages resulting from use of this information or for any errors or omissions. ©2008 SolaHD. All rights reserved throughout the world. Specifications are subject to change without notice.
  • Page 3: Important Safety Instructions

    1.0 Important Safety Instructions This manual contains important safety instructions. Read all safety, installation, and operating instructions before operating the Uninterruptible Power System (UPS). Adhere to all warnings on the unit and in this manual and follow all oper- ating and user instructions. This equipment is designed for Industrial or Commercial use and can be installed and operated by individuals without previous training.
  • Page 4: Wiring Diagram

    3.0 Wiring Diagram 3.1 SDU DC UPS with SDU 24-BAT Battery Module RS232-DB9 SDU 24-DB9 24Vdc / 10A OUTPUT DC REMOTE 24V/35mA ON/OFF BATTERY FAULT ON BATTERY LOW BATTERY Industrial DC UPS SDU 24-BAT AC Source ON/OFF/TEST 22.5-28.5 Vdc Industrial DC UPS...
  • Page 5: Replacing The Battery

    4.0 Replacing the Battery 4.1 Limitation of Liability SolaHD assumes no liability for incidental or consequential loss or damage due to the third-party servicing or placement of batteries in SolaHD products, including but not limited to, liability for injury, loss of life, property damage, loss of use, loss of data, loss of time, inconvenience or commercial loss, or breach of implied or expressed warranties.
  • Page 6 4.4 Battery Replacement Instructions When removing and installing the new batteries, extreme care must be used not to short the metal chassis parts across the battery terminals and not to short the batteries to each other. Personal injury may result. The battery can present a risk of electrical shock and high short circuit current.
  • Page 7 3. Carefully slide the front cover forward and off the enclosure. Do not disconnect the wires from the polarized terminals. 4. Remove the wires from the battery posts. 5. Remove the failed battery/batteries. Insert the new battery/batteries. 6. Use the following connection diagram to ensure a proper connection to the fuse protection board and polarized terminals.
  • Page 8 8. Using four screws, secure the protection fuse board. 9. Slide the front cover onto the enclosure. 10. Secure the assembly with eight screws. Clearwater Tech - Phone: 800.894.0412 - Fax: 208.368.0415 - Web: www.clrwtr.com - Email: info@clrwtr.com...
  • Page 9 (in minutes vs. load percentage) NOTE: Resistive loads were used to measure the battery run times. Using other types of loads may result in different battery run times. 5.1 SDU 10-24 with SDU 24-BAT Load 20% (2 A) 40% (4 A)
  • Page 10: Specifications

    Safety Standard for SDU DC UPS System* C22.2 No 107-1-01, CAN/CSA C22.2 No 60950-1 The SDU DC UPS system includes a power module (SDU 10-24 or SDU 20-24) and a battery module (SDU 24-BAT or SDU 24-BATEM). 7.0 Product Registration & Warranty Information 7.1 Product Registration To register your product for updates and information on service and support: •...

Table of Contents