The type and quantity of components may vary for different style sheds.
Assembly of all shed styles is by the same method as detailed.
Before assembling the shed, please check that all parts are present. Report
any shortages or other issues immediately.
DO NOT
attempt to modify the shed or any of it's parts as this may
invalidate the warranty.
No. Componets
1
Front panel
2
Rear panel
3
Right side panel
4
Left side panel
5
Felt
6
Door
7
Floor (may be 2 or 3 panels)
8
Roof panel
9
Windows (optional)
10
Window bead 15mm x 20mm (optional)
11
Tee Hinges
12
Turn button
13
Floor bearers tanalised 26mm x 38mm
14
Barge boards
15
Corner cover strips 11mm x 41mm
15
Side panel joining strip 11mm x 41mm
16
Apex
Number
1
1
2 (8ft deep shed has 1 side panel)
2 (8ft deep shed has 1 side panel)
1
1 (single door) 2 (double door)
2 or 3
4 or 6
Optional
Optional
3 (single door)
6 (double door)
1 (single door)
2 (double door)
Variable
4
4
2 (8ft deep shed has no joining strips)
2
No. Fixings
1
60mm screws
2
40mm screws
3
25mm black screws
4
30mm nails
5
10mm clout nails
6
30mm panel pins (windows options only)

Advertisement

loading

Summary of Contents for Empire Premier Apex 8000

  • Page 1 The type and quantity of components may vary for different style sheds. Assembly of all shed styles is by the same method as detailed. Before assembling the shed, please check that all parts are present. Report any shortages or other issues immediately. DO NOT attempt to modify the shed or any of it's parts as this may invalidate the warranty.
  • Page 2 The floor and floor bearers are supplied separately. The ROOF is supplied with batons attached. If your shed has two or more floor boards, please follow one of the following methods shown in the diagram below. The floor bearers will be either the same length as the width or the depth of the floor. Place each floor bearer approx.
  • Page 3 Step.4 Step.1 Position the front and rear apex panels on to the top of the front and rear panels. Fix the apex panels in place using the Lay two of the large roof boards onto the shed as shown. Using the 40mm screws, fix the roof brace into position by 60mm screws as shown above.
  • Page 4 If the shed has more than tow lengths of felt, position the first length along the lower edge on one side of the roof and fix as shown. Repeat on the other side of the shed. Place the final piece of the felt over the apex of the roof, ensuring To fit the windows it is recommended that a waterproof sealant is applied around the edge of the glazing before fitting.