Download Print this page
Adcraft VS-300 Instruction Manual

Adcraft VS-300 Instruction Manual

Vacuum packaging machine

Advertisement

Quick Links

INSTRUCTION MANUAL
VS-300
VACUUM PACKAGING MACHINE
This manual contains important information regarding your Adcraft unit. Please read this manual
thoroughly prior to equipment set-up, operation and maintenance. Failure to comply with regular
maintenance guidelines outlined in this manual may void the warranty.

Advertisement

loading
Need help?

Need help?

Do you have a question about the VS-300 and is the answer not in the manual?

Questions and answers

Summary of Contents for Adcraft VS-300

  • Page 1 VS-300 VACUUM PACKAGING MACHINE This manual contains important information regarding your Adcraft unit. Please read this manual thoroughly prior to equipment set-up, operation and maintenance. Failure to comply with regular maintenance guidelines outlined in this manual may void the warranty.
  • Page 2: Important Tips

    WARNINGS • Do not touch any hot surfaces • Plug only into a 3-hole grounded electrical outlet of the appropriate voltage • Do not immerse unit, cord or plug in liquid at any time • Unplug cord from outlet when not in use and before cleaning •...
  • Page 3 Control Panel 1. Vacuum Gauge - Indicates the vacuum level inside the chamber. Function Lights: Vacuum - Illuminates to adjust vacuum time as well as during the vacuum process. During set up, adjust the vacuum time using the UP/DOWN buttons. Sealing - Illuminates to adjust vacuum time as well as during the sealing process.
  • Page 4 Adding Oil to the Vacuum Machine NOTE: OIL MUST BE ADDED TO THE MACHINE PRIOR TO USE. MAKE SURE THE UNIT IS TURNED OFF AND UNPLUGGED BEFORE ADDING OIL. Back of housing Oil fill bolt cabinet Oil site glass 1. Prepare the oil - Fill the empty oil bottle with the oil that comes with the machine. 2.
  • Page 5 Adjusting the Timing Controls NOTE:All timing adjustments must be made with the lid lock off and the lid open. To adjust or set the timing controls, press the SET button on the control panel until the required label (Vacuum, Sealing or Cooling) is illuminated. For each selection, the current time setting will show on the LED screen.
  • Page 6 Problem Possible Causes Solution Power light is on but the unit It’s either a defective ther- is not getting hot when you mostat or a burnt out heating Replace the broken part turn the thermostat up element Temperature keeps rising on The thermostat is malfunc- Replace the thermostat it’s own...
  • Page 7 Replacement Parts for the Vacuum Packaing Machine October 2016...
  • Page 8 October 2016...
  • Page 9 October 2016...
  • Page 10 October 2016...