Page 1
Aluminum Stairs Assembly Instructions PN10922, 10923, 10924, 10925, 10926 RECOMMENDED TOOLS Wrenches or sockets: 10mm (3/8”) 16mm (5/8”) 19mm (3/4”) Cordless Drill 7/16” Drill Bit Screwdriver (Phillips) Work Gloves (651) 674-2450 Scan for Online Help: FAQ, Online support info@patriotdocks.com...
Page 2
Aluminum Stairs Components PART DESCRIPTION (Depends on model) Stair Stringer (Left and Right) Steps Drop Leg and Base Handrail Vertical 2 or 4 Handrail 1 or 2 Upper Handrail Bracket 1 or 2 Lower Handrail Bracket 1 or 2 Patriot Post Caps 2 or 4 2-Step Stairs (PN10922) and 3-Step Stairs (10923) only come with (1) Handrail Assembly.
Page 3
Aluminum Stairs Assembly Steps Hardware: Size Purpose Qty. M6x20mm Step Attachment Hardware 10-26 M10x80mm Vertical Handrail Attachment Hardware M10x70mm Attaching Upper & Lower Handrail Brackets *Quantities will vary depending on the model you purchased. Connect all Steps (B) to Left and Right Stair Stringers (A) using M6x20mm Button Head bolt with nylock nuts.
Page 4
Aluminum Stairs Assembly Steps Determine desired Stair mounting location. Ensure the water depth is Figure 3 appropriate for the number of steps, and that the steps will be level. Mounting Stairs to Patriot Frame Align the top mounting hole on the Stair Stringer (A) bracket with one of the top 3/8”...