These instructions are intended for use only by experienced, qualified combustion start-up
personnel. Adjustment of this equipment and its components by unqualified personnel can result in
fire, explosion, severe personal injury, or even death.

TABLE OF CONTENTS

Subject
General Information ................................................................................
Receiving and Inspection ..........................................................................
Capacities ............................................................................................
Dimensions ...........................................................................................
Installation ............................................................................................
Operation..............................................................................................
Maintenance..........................................................................................
Recommended Spare Parts List................................................................
Required Reference: Appropriate System Schematic
SHE 15B, 20B, 25B - Y7366
SHE 30B, 35B, 40B, 45B, 50B, 55B, 60B, 70B - Y7298
SHE 80B, 90B - Y7367
SHE 100B, 110B - Y7368
SHE 120B, 130B - Y7369
SHE 140B, 160B, 200B - Y7370
These instructions are intended to serve as guidelines covering the installation, operation, and maintenance of Hauck equipment. While
every attempt has been made to ensure completeness, unforeseen or unspecified applications, details, and variations may preclude
covering every possible contingency. WARNING: TO PREVENT THE POSSIBILITY OF SERIOUS BODILY INJURY, DO NOT USE OR
OPERATE ANY EQUIPMENT OR COMPONENT WITH ANY PARTS REMOVED OR ANY PARTS NOT APPROVED BY THE
MANUFACTURER. Should further information be required or desired or should particular problems arise which are not covered
sufficiently for the purchaser's purpose, contact Hauck Mfg. Co.
HAUCK MANUFACTURING CO.,
11/06
SHE SUCTION OIL HEATER
ELECTRIC TYPE
P.O. Box 90 Lebanon, PA 17042-0090 717-272-3051
www.hauckburner.com
WARNING
Fax: 717-273-9882
INSTRUCTIONS
Page
2
2
3
5
5
8
9
9
SHE-9

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SHE 15B and is the answer not in the manual?

Questions and answers

Summary of Contents for Hauck SHE 15B

  • Page 1: Table Of Contents

    SHE 140B, 160B, 200B – Y7370 These instructions are intended to serve as guidelines covering the installation, operation, and maintenance of Hauck equipment. While every attempt has been made to ensure completeness, unforeseen or unspecified applications, details, and variations may preclude covering every possible contingency.
  • Page 2: General Information

    Annual review and upgrading of safety equipment is recommended. A. GENERAL INFORMATION Heavy, waste, or recycled fuel oils require some means of viscosity control. A Hauck SHE Electric Oil Suction Heater installed in the fuel storage tank is a perfect solution to the viscosity problem.
  • Page 3: Capacities

    Page 3 SHE-9 C. CAPACITIES Oil Temperature Rise (°F) Model Number Rating Oil Capacity (gph) SHE 15B SHE 20B SHE 25B SHE 30B SHE 35B SHE 40B SHE 45B SHE 50B SHE 55B 1053 SHE 60B 1149 SHE 70B 1340 1072...
  • Page 4 Page 4 SHE-9 C. CAPACITIES (Continued) Oil Temperature Rise (°C) Model 15.6 21.1 26.7 32.2 37.8 43.3 48.9 54.4 Number Rating Oil Capacity (lph) SHE 15B 1086 SHE 20B 1450 1158 SHE 25B 1813 1450 1207 1037 SHE 30B 2173...
  • Page 5: Dimensions

    See appropriate Dimension sheet for detailed dimensional information. E. INSTALLATION The Hauck SHE is designed to be installed horizontally through the side wall or head of the fuel storage tank. Cut an opening near the bottom of the tank (leaving clearance for connections), insert the SHE body and seal weld it to the tank.
  • Page 6 Page 6 SHE-9 Figure 1. Typical Heavy Oil Piping – Single Burner System...
  • Page 7 Page 7 SHE-9 Figure 2. Typical Heavy Oil Piping – Multiple Burner System...
  • Page 8: Operation

    Page 8 SHE-9 F. OPERATION WARNING The heater should not be operated unless the unit is full of oil and the pump is running. IMPORTANT The High Oil Temperature Limit controller, located inside the panel, shold have the trip setpoint approximately 20°F (11°C) higher than the Oil Temperature controller setpoint.
  • Page 9: Maintenance

    SHE-9 G. MAINTENANCE Hauck SHE’s are fully automatic and will require very little maintenance. Cleaning inside the SHE, as mentioned previously, is important and should not be neglected. A proper cleaning schedule must be set up to ensure optimum SHE performance. After emptying the tank, cleaning can be accomplished by breaking apart the flange behind the SHE terminal box and pulling the heating elements out of the tank.
  • Page 10 Page 10 SHE-9 This page left intentionally blank. HAUCK MANUFACTURING CO., P.O. Box 90 Lebanon, PA 17042-0090 717-272-3051 www.hauckburner.com Fax: 717-273-9882...

Table of Contents