Advertisement

Quick Links

ARD-3-63-ISL-SPD
Installation Manual
V1.10 Jan 2023

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ARD-3-63-ISL-SPD and is the answer not in the manual?

Questions and answers

Summary of Contents for Matt:e ARD-3-63-ISL-SPD

  • Page 1 ARD-3-63-ISL-SPD Installation Manual V1.10 Jan 2023...
  • Page 2: Table Of Contents

    Contents Product Description Warning Notice Safety Advice Introduction Dimensions Fixing Positions Electrical Connections Installation instructions Operating Instructions Test Function SPD Operation Specifications Warranty Declaration of Conformity PRODUCT ADVISORY NOTICE This product must be installed by a competent person in accordance with the IET Wiring Regulations, BS7671 (18 Edition or later) and current Building Regulations.
  • Page 3: Product Description

    The unit must be installed in a dry ventilated location; it must never be covered or have restricted ventilation. The ARD-3-63-ISL-SPD units are rated for a maximum load of 63A per phase. For any information not contained within this document, please contact our technical support team on 01543 227290 or info@matt-e.co.uk.
  • Page 4: Introduction

    Introduction matt:e range of Electric Vehicle Charger Connection Units are fitted with O-PEN® technology designed to protect Electric Vehicle Charging equipment when installed onto 3 phase PME infrastructures. The unit incorporates a 5-pole isolator with a built-in under-voltage release mechanism. On detection of fault conditions, the O-PEN®...
  • Page 5: Dimensions

    Dimensions P a g e...
  • Page 6: Fixing Positions

    Fixing Positions P a g e...
  • Page 7: Electrical Connections

    Electrical Connections The user wiring connections are indicated in the image below. P a g e...
  • Page 8: Installation Instructions

    Installation instructions Connect the incoming cable from the distribution board directly to the 4-pole isolator. The CPC should be connected to the terminal block Connect the outgoing cable(s) to the double pole isolators. The outgoing CPC should be connected to the green isolated earth bars.
  • Page 9: Operating Instructions

    Operating Instructions With the incoming isolator closed the unit will monitor the incoming supply. If no fault condition is present approximately 1 second after closing the incoming isolator the O-PEN monitor will energise the under-voltage release mechanism of the 5-pole isolator (indicated by the green LED illuminating).
  • Page 10: Spd Operation

    There is not a set time on how long these devices will last as it depends on the amount of surges the devices protects the installation from. matt:e recommends that the SPD is checked a minimum of every 6 months.
  • Page 11: Specifications

    2.5 mm 25.0mm tightening torque 1.5Nm Warranty The ARD-3-63-ISL-SPD is guaranteed for a period of 1 year from the date of manufacture. This warranty is limited to the replacement of faulty components only. t: 01543 227290 e: info@matt-e.co.uk w: www.matt-e.co.uk...
  • Page 12: Declaration Of Conformity

    EN60947-3 Low-voltage switchgear and control gear BS EN 61643-11-2012+A11:2018 Low-voltage surge protective devices EN61095 Electromechanical contactors EN61009-1 Residual current operated circuit-breakers with integral overcurrent Signed for and on behalf of: matt:e Ltd Place of issue Date R Winter, Director Tamworth, England...

Table of Contents