TABLE OF CONTENTS INTRODUCTION FUNCTIONALITY & GENERAL SAFETY Equipment methodology Installation Safety Icons Critical Safety Features Personnel Protection Equipment (PPE) General Warnings Making Changes and Fabricating Non OEM Components Machine Warranty TECHNICAL SPECIFICATIONS CONSTRUCTION CONTROLS Before Departure Positioning the Vehicle Hydraulic Reel Control Engine Counter Run Dry Protection (Optional)
1.0 INTRODUCTION Foreword This operator’s manual is designed for trained and competent users of industrial jetting equipment as prescribed by the Water Jetting Association of the United Kingdom. The purpose of the manual is to ensure safe and efficient operation of the equipment with any associated drawings or images to serve as a guide only.
2.0 FUNCTIONALITY & GENERAL SAFETY 2.1 Equipment Methodology ⊲ 1 bar is equal to 14.5 psi ⊲ 1 UK gallon is equal to 4.55 litres The integrated engine drives the high-pressure pump via a gearbox system or drive belt. This pump There are many types of engines and pumps and receives water from the water tank (which is usually many arrangements of equipment resulting in...
2.0 FUNCTIONALITY & GENERAL SAFETY 2.4 Critical Safety Features For additional protection of people or equipment, unloader valves and run-dry switched are included as standard on all new equipment. Unloader valves return pressurised water back to the tank, unlike the Emergency Stop standard burst disc arrangement.
2.6 General Warnings From our experience of commonly reported carbon monoxide. Carbon monoxide is odour- incidents and near misses, please take note of less, colourless, and can cause death if inhaled. the following: Always operate the jetting machine with the ⊲...
4.0 CONSTRUCTION 2-SERIES High-Pressure Hose Reel Kubota D902 3-Cylinder Diesel Engine Drain and Anti Freeze Filling Point Air Filter Water Tank Fuel Tank Supply Opening Water Tank Emergency Stop Inlet Hose Reel Battery Inlet Hose Reel Handles Engine Oil Drain Control Panel Nozzle Mounts Water Filter...
5.0 CONTROLS Note: all controls and their operation will be clearly labelled on all new equipment. 5.1 Before Departure any damage to the hose you should have it replaced by an authorised agent immediately Before you drive away, check the following: 5.4 Engine Counter ⊲...
5.0 CONTROLS: OPERATING THE MACHINE 5.7 Starting The Engine ⊲ Stop the engine, store any accessories and drain the water tank down to approximately To start the engine using the electronic control panel, 5-10% capacity take the following steps: 5.10 Operating the Ensure you are in a position to operate the equipment safely Equipment...
5.11 Using The Radio 5.12 Nozzle Application Remote Control (Optional) The high pressure nozzles are designed to use pressure to pull the hose through the sewer pipe and ⊲ If no remote control is fitted switch the control depending on application and nozzle, a degree of panel to manual cleaning or unblocking will commence immediately.
5.0 CONTROLS A safety lance or unloader lance has the valve ⊲ Turn selector valve to dump and turn the incorporated in its design so that any back remote briefly onto pressure (remote only) pressure will eject from the lance, normally through ⊲...
5.15 Recommended Maintenance Schedules We would recommend the following maintenance plans conducted by a recognised service agent using only OEM parts. ACTION FREQUENCY INITIAL SERVICE After first 50 hours of operation. We recommend that the first service is through an AG approved Service Centre. ANNUAL SERVICE We recommend that your jetting machine is serviced annually by an AG approved Service Centre.
6.0 TROUBLESHOOTING 6.1 Troubleshooting Guide Failure Reason Solution Machine has run out of fuel Add fuel Main or secondary fuse blown Contact your service agent Engine does not start or Battery voltage too low Charge or replace stops abruptly Emergency stop activated Release the emergency stop on machine/ remote Water tank empty...
Failure Reason Solution Handle not on correct position Put the handle into the correct position Hydraulic tank almost empty Refill the tank. Check the system for leaks Hydraulic reel does not Working pressure set too low Increase the working pressure, if possible wind the hose Return filter for hydraulic tank dirty Switch off the machine and clean the return...
7.0 SERVICE CENTRES Manufacturing Sales + Service Andy Guest Jetters Ltd Rioned UK Ltd FreeFlow House Unit 11, Riparian Way The Crossings Business Park Stephenson Way Cross Hills, Keighley Thetford, Norfolk, IP24 3RU West Yorkshire BD20 7BW United Kingdom T +44 (0)3300 240404...
⊲ and the following harmonised standards have been applied: NEN-EN-ISO 12100-1, NEN-EN-ISO 12100-2, NEN-EN-ISO 13850, NEN-EN-ISO 13857, NEN-EN-349, EN 60204-1 Jan Pieters Jan Pieters Managing Director On Behalf of: Rioned UK Ltd & Andy Guest Jetters Ltd 2-SERIES OPERATOR’S MANUAL...
Page 20
Manufacturing Sales + Service Andy Guest Jetters Ltd Rioned UK Ltd FreeFlow House Unit 11, Riparian Way The Crossings Business Park Stephenson Way, Thetford Cross Hills, Keighley Norfolk, IP24 3RU West Yorkshire BD20 7BW United Kingdom T +44 (0)3300 240404...
Need help?
Do you have a question about the Andy Guest Jetters 2 Series and is the answer not in the manual?
Questions and answers