Physical to Logical Port Assignment
2 Logical Port Label Assignment
2x 10 Gb SFP+
18.
ports
Dual power
19.
supply
2.11 LoadMaster LM-8000 and 8010-MT
Port Location - Front Panel
30
Blinking - network activity
Two 10 Gbps supporting fiber optic and direct-attach
© 2022 Progress Software Corporation and/or one of its subsidiaries or affiliates. All rights reserved.
Activity LED
Link LED
copper (DAC) cables.
Activity LED
Link LED
750 W AC power supply
Off - no
network
activity
Blinking -
network
activity
Off - no link
(cable
disconnected)
Continuously
illuminated –
link
Logical
Assignment
Port 4:5 map to
ETH5:ETH4
Off - no
network
activity
Blinking -
network
activity
Off - no link
(cable
disconnected)
Continuously
illuminated –
link