Download Print this page
Wallenstein P3 Pulse Installation Instructions Manual

Wallenstein P3 Pulse Installation Instructions Manual

Display kit
Hide thumbs Also See for P3 Pulse:

Advertisement

Quick Links

INSTALLATION INSTRUCTIONS
C 550
™ Display Kit
Rev Feb-2023
Part Number: Z97853_En
02079

Advertisement

loading
Need help?

Need help?

Do you have a question about the P3 Pulse and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Wallenstein P3 Pulse

  • Page 1 INSTALLATION INSTRUCTIONS C 550 ™ Display Kit Rev Feb-2023 Part Number: Z97853_En 02079...
  • Page 2 The P3 Pulse display accessory only works with P3 Pulse controllers and wire harnesses that are version 3.0 and above. Illustrations are provided for reference only. Some details may not be shown.
  • Page 3: Safety Alert Symbol

    C550 P3 Pulse Display 2. Safety 2.1 Safety Alert Symbol This Safety Alert Symbol means: ATTENTION! BE ALERT! YOUR SAFETY IS INVOLVED! The Safety Alert Symbol identifies important safety messages on the machine and in this instruction. This symbol means be alert to the possibility of personal injury or death.
  • Page 4: Accessory Components

    C550 P3 Pulse Display 3. Accessory Components Figure 1 – C550 accessory kit components Item Part Number Description Quantity 1062E004 P3 Pulse display Z77817 Screw, M4x 0.7 x 5 mm...
  • Page 5 4.1 Install a P3 Pulse Display on a BX52RI, BX72RI, or BX102RI Wood Chipper The following images show the BX52RI model; however, the process is the same for all three models.
  • Page 6 C550 P3 Pulse Display Step 3 Remove the four screws from the mounting bracket. Set aside the fasteners. They are not necessary for installation. Step 4 Remove the mounting bracket. Set aside the mounting bracket. It is necessary for installation.
  • Page 7 C550 P3 Pulse Display Step 6 Put the P3 Pulse display (1) in the indicator panel location. Step 7 Install the mounting bracket on the rear of the display (1). Align the four mounting bracket holes with the display. Step 8 Install the four screws (2) through the mounting bracket and into the display (1).
  • Page 8 C550 P3 Pulse Display Step 9 Connect the wire harness to the display (1).
  • Page 9 Components that hang on a wire harness can damage the wires and connectors. Step 1 The P3 Pulse indicator panel is on the left side of the machine. Step 2 Remove the three bolts and three washers from the machine guard that the indicator panel is installed on.
  • Page 10 C550 P3 Pulse Display Step 3 On the rear of the indicator panel, disconnect the wire harness from the indicator panel. Step 4 Remove the four screws from the mounting bracket. Set aside the fasteners. They are not necessary for installation.
  • Page 11 C550 P3 Pulse Display Step 6 Remove the indicator panel from the machine guard. Step 7 Put the P3 Pulse display (1) in the machine guard.
  • Page 12 C550 P3 Pulse Display Step 8 Install the mounting bracket on the rear of the display (1). Align the four mounting bracket holes with the display. Step 9 Install the four screws (2) through the mounting bracket and into the display (1).
  • Page 13 C550 P3 Pulse Display Step 11 Attach the machine guard to the machine. Install the three bolts and three washers that were removed in step 2. Only hand tighten the fasteners.
  • Page 14 Components that hang on a wire harness can damage the wires and connectors. Step 1 The P3 Pulse indicator panel is on the right side of the machine. Step 2 Remove the four bolts from the machine guard that the indicator panel is installed on.
  • Page 15 C550 P3 Pulse Display Step 3 On the rear of the indicator panel, disconnect the wire harness from the indicator panel. Step 4 Remove the four screws from the mounting bracket. Set aside the fasteners. They are not necessary for installation.
  • Page 16 Step 6 Remove the indicator panel from the machine guard. Step 7 Put the P3 Pulse display (1) in the machine guard. Step 8 Install the mounting bracket on the rear of the display (1). Align the four mounting bracket holes with the display.
  • Page 17 C550 P3 Pulse Display Step 9 Install the four screws (2) through the mounting bracket and into the display (1). Step 10 Connect the wire harness to the display (1). Step 11 Attach the machine guard to the machine. Install the four bolts removed in step 2.
  • Page 18 C550 P3 Pulse Display 5. Test the Electrical Connection The procedures in this section tests the P3 Pulse display electrical connection. For more information, see the wood chipper Operator's Manual. 5.1 Test the Electrical Connection on a BX52RI, BX72RI, or BX102RI Wood Chipper 1.
  • Page 19: Product Warranty

    C550 P3 Pulse Display 6. Product Warranty LIMITED WARRANTY Wallenstein products are warranted to be free of defects in materials and workmanship under normal use and service, for a period of Five Years for Consumer Use Two Years for Commercial/Rental Use from the date of purchase, when operated and maintained in accordance with the opera�ng...
  • Page 20 WallensteinEquipment.com...

This manual is also suitable for:

C550