Download Print this page

Advertisement

Quick Links

Operating Instructions - BiLED Surface Mounted
Gerneral Description
The BiLEDs are fully automatic self testing emergency lighting luminaires and
does not require a key switch testing facility.
1. Luminaires should only be installed by suitably
qualified personnel
2. Installation should be carried out in accordance with the requirements of
BS7671 and BS5266 Pts 1 and 8 as well as BS EN 1838.
3. Before installing, connecting or servicing these luminaires, isolate the
mains supply to which they are to be connected.
Technical Specification
Supply Voltage
230V +10% -10%, 50/60Hz
Mode of Operation
Non Maintained or Maintained
Weight
Duration
3 hours
24 hours for full duration
Recharge period
(14 hours for 1 hour)
Light sources
High Efficiency white LEDs
Battery
2.4V 2000mAh High Temperature NiMh
Ambient temperature
Degree of Protection
Conformity
BSEN 60.598-2-22
Testing regime
Luminaires incorporate fully automatic selt testing and will regularly test for
correct lamp (LEDs) functioning and for battery functioning in accordance with
a predefined test programme that exceeds the requirements of BSEN50172 /
BS5266 Pt.8: 2004.
See separate FASTEL test regime description.
Remote control and monitoring (SRM units only)
All SRM version luminaires incorporate remote control and monitoring
capability. Luminaires may be connected, either via CB100 Collector boxes or if
less than 125 luminaires are to be monitored, directly to a M-web unit to a LAN
or internet connection and remotely controlled and monitored. All SRM
luminaires are assigned individual addresses before leaving the factory and
should be installed in accordance with the installation plans. Details of the
remote control and monitoring operation may be found in separate sheet.
1.0 Kg
IP20
P4 Limited
1 Wymans Way, Fakenham, Norfolk NR21 8NT
T: 01328-850555
F: 01328-850559
E: info@p4fastel.co.uk
www.p4fastel.co.uk
2016 copyright all rights reserved
Details correct at time of publication P4 reserve the right to change specification at any time.
YOUR AUTHORITY IN SELF-TESTING EMERGENCY LIGHTING
Installation and Operating Instructions for
BiLED Surface Mounted
650-1122 Issue 1. June 2016
Drawn By T. Skevington - Approved By R. Warner

Advertisement

loading

Summary of Contents for P4 BiLED

  • Page 1 F: 01328-850559 E: info@p4fastel.co.uk www.p4fastel.co.uk 2016 copyright all rights reserved 650-1122 Issue 1. June 2016 Details correct at time of publication P4 reserve the right to change specification at any time. Drawn By T. Skevington - Approved By R. Warner...
  • Page 2 5. Apply mains supply to test the luminaire. The indicator LED will show flashing green and the LEDs will illuminate if the Switched Live supply is 2. The BiLED Surface Mounting Plate as been design to work on a flat connected and switched on.