Factory Assisted Start-Up consists of a Desert Aire Service Department Technician to visit the job-site and provide supervisory
experience to installing contractors as they perform the required procedures as outlined in our warranty activation start-up report.
The company technician will also present an educational review of the air handler's operating and maintenance requirements.
Factory Assisted Start-Up is not an installation bid & therefore the system must be ready to run before scheduling.
CST Start-Up is performed by a local Certified Service Technician who has been trained by Desert Aire. The CST performs all
duties listed above. In addition they will supply the "items to be supplied for start-up" as listed below. Please note charges for
refrigerant will apply if refrigerant is necessary to complete the start up.
Items to be completed by the installing contractor before any Start-Up can be scheduled:
Air handler leak checked and inspected for internal concealed damage – remove access panels and inspect
the interior of the unit for transit damage. Contact Desert Aire immediately if damage is noted (262) 946-7400
Air handler leveled and properly supported per the installation manuals recommendations.
Condensate P Trap installed with heat trace for winter operation.
All electrical connections terminated and verified for proper voltage at the unit and the condenser (if applicable)
All field controls, sensors and actuators installed and circuits verified that they are wired correctly.
If you have questions, contact Desert Aire for instructions (800) 443-5276.
Inspect all water lines for leaks and purge air from lines. (If applicable)
Items to be supplied by the installing contractor (Factory Assisted Start-Up only)
Equipped service vehicle and service technician – Technician will be trained.
Water pressure measurement device
Air balancing equipment (magnehelic or manometer differential pressure gauge – one inch scale)
Volt/Amp/OHM meters in working order.
Digital thermometer with sensors.
If you are unable to supply any of the required equipment you must contact Desert Aire before returning this document.
I agree that all of the above has been completed as of
job-site preparation an additional purchase order must be issued to Desert Aire for re-scheduling. A two week minimum is
needed to schedule start-up. Once the form is completed please fax or email both pages to the Desert Aire service department.
Fax (262) 946-7401 Email: service@desert-aire.com
Signature of responsible party:
Company Name:
Start-up request form for GreenAire units
Model GR
(Date) If a return trip must be scheduled due to insufficient
(print)
#:
Phone
N120 W18485 Freistadt Road
Germantown, WI 53022
(262) 946-7400 Fax: (262) 946-7401
www.desert-aire.com
(sign)
45

Advertisement

Table of Contents
loading

Table of Contents