Agilent G5585B PlateLoc Thermal Microplate Sealer
Installation Checklist
Thank you for purchasing an Agilent G5585B PlateLoc Thermal Microplate Sealer. This checklist is
used by the installing engineer to ensure that the instrument and associated systems are correctly
installed, upgraded and functioning as designed in your facility. This checklist will be completed at the
end of the service and provided to you as a record of the installation.
Customer Information
Customers should provide all necessary operating supplies upon request of the Field Service Engineer.
Service Engineer's Responsibilities
•
Only complete/printout pages that relate to the system being installed.
•
Complete empty fields with the relevant information
•
Complete the relevant checkboxes in the checklist using a "X" or tick mark "" in the checkbox.
•
Complete Not Applicable check boxes to indicate services not delivered, as needed
•
Complete the Service Review section together with the customer
Additional Instruction Notes
•
Follow the unpacking and installation instructions specified in the G5585B PlateLoc Thermal
Microplate Sealer User Guide (part number G5051-90002).
•
Save the packing materials and shipping container in case you are required to move or ship the
device. Packing the PlateLoc using other materials might damage the device and void your warranty.