Mitsubishi PAC-YG60 MCA-J Installation Instructions Manual
Mitsubishi PAC-YG60 MCA-J Installation Instructions Manual

Mitsubishi PAC-YG60 MCA-J Installation Instructions Manual

Air conditioner network system pi controller

Advertisement

Quick Links

Mitsubishi Electric Air Conditioner Network System
PI controller
PAC-YG60MCA
Installation/Instruction Manual
Before using the PI controller, please read this installation/instruction manual carefully to ensure proper operation.
Keep this installation/instruction manual for future reference.
Contents
1.
Safety Precautions .............................................. 1
2.
Device Capabilities ............................................. 1
3.
Confirmation of Parts .......................................... 2
4.
Specifications ...................................................... 2
4-1.
Product Specifications ....................... 2
4-2.
External View ..................................... 2
5.
Example of System Configuration....................... 3
6.
Installation Method .............................................. 4
6-1.
6-2.
Installation Procedure ........................ 5
7.
Wiring Method ..................................................... 6
7-1.
Names of Parts .................................. 6
7-2.
M-NET Transmission Line ................. 7
7-3.
8.
Initial Setting Procedure ...................................... 9
9.
Switch List ......................................................... 10
10.
Display Content................................................. 11
10-1.
Display Content List ......................... 11
10-2.
Display ............................................. 11
11.
Test Run ........................................................... 12
12.
Precautions for Expansion ................................ 12
Page

Advertisement

Table of Contents
loading

Summary of Contents for Mitsubishi PAC-YG60 MCA-J

  • Page 1: Table Of Contents

    Mitsubishi Electric Air Conditioner Network System PI controller PAC-YG60MCA Installation/Instruction Manual Contents Page Safety Precautions ..........1 Device Capabilities ..........1 Confirmation of Parts .......... 2 Specifications ............2 4-1. Product Specifications ....... 2 4-2. External View ........2 Example of System Configuration....... 3 Installation Method ..........
  • Page 2: Safety Precautions

    Safety Precautions • Before using the device, thoroughly read the following safety precautions and use as directed. • Hazards and levels of danger that can occur due to incorrect handling are classified by the following symbols. Warning Incorrect handling can result in death, serious injury, etc. Caution Incorrect handling can result in injury or damage to the building or its contents.
  • Page 3: Confirmation Of Parts

    Installation/instruction manual (this document) * In addition to the parts mentioned above, other parts need to be procured locally in order to operate this device. Furthermore, other Mitsubishi optional parts may be required depending on how the device is to be used.
  • Page 4: Example Of System Configuration

    Example of System Configuration <Restrictions> Maximum of 5 units (total of 20 channels) per G(B)-50A However, the number of units that can be connected to a G(B)-50A is up to 50 including this device, an indoor unit, Lossnay unit, etc. * For the number of units that can be connected when Centralized control line controlling this device with TG-2000A, refer to the...
  • Page 5: Installation Method

    Installation Method 6-1. Parts to be Procured Locally Prepare the following parts to install this device. Required Part Specification Unit fixing screws M4 screw × 4 Power source: 24 VDC 0.2 A (Minimum loading), SELV circuit, power line with grounding terminal Ripple noise: Lower than 200 mVp-p Compatible specification Power supply for this...
  • Page 6: Installation Procedure

    6-2. Installation Procedure The PI controller PAC-YG60MCA does not have a waterproof structure. Be sure to install the PI controller inside a control panel that is located indoors. Prepare a control panel capable of storing this device such as the one shown in the figure. (Install the device in a control panel strong enough to withstand a weight of 0.6 kg [1 lb].) This device can be installed flat or vertically.
  • Page 7: Wiring Method

    (3) Refer to "7 Wiring Method" and connect the wires for the power line, M-NET transmission line, and input/output signal lines. M-NET Pulse Input Power line Caution: Perform wiring so that the terminal block is not strained. If strained, use a wire guide or junction terminal to alleviate the stress on the terminal block.
  • Page 8: Connecting The Power Line And M-Net Transmission Line

    7-2. Connecting the Power Line and M-NET Transmission Line Tightening torque for terminal screws: 1 N·m Connect the device to a power supply unit (PAC-SC50KUA) for the transmission line or an outdoor unit (either a centralized CN17 control line or indoor control line can be connected). CN16 A/B/S * Only the M-NET circuitry of this device receives the power from the...
  • Page 9: Connecting The Signal Lines

    7-3. Connecting the Signal Lines • Separately procure items such as terminal blocks and cables locally. • The maximum wire length is 100 m. However, since the use of long wires makes the device susceptible to noise, using wires shorter than 10 m is recommended. (1) Pulse input (non-voltage a contact) * To use these, various settings need to be configured.
  • Page 10: Initial Setting Procedure

    Initial Setting Procedure After completing the procedures described in "6 Installation Method" and "7 Wiring Method", set the initial settings in accordance with the procedure described below. (1) M-NET address settings Note: • An address from 01 to 50 can be set. •...
  • Page 11: Switch List

    Switch List Supported Function Remark Channel SW01 Channel 1 Use of input contact Set whether to use the Channel 1 input. Channel 2 Use of input contact Set whether to use the Channel 2 input. Channel 3 Use of input contact Set whether to use the Channel 3 input.
  • Page 12: Display Content

    Display Content The LEDs of this device indicate the pulse input status and error status of this device. 10-1.Display Content List Display Item Display LED Content Note : On, : Off, : Flashing Power supply status (1) Power supply to LED16 : Lights when the CPU is energized.
  • Page 13: Test Run

    Test Run Use the following procedure to confirm operation of the system. (1) Configure the settings of this device and the system controllers while referring to "8 Initial Setting Procedure". (2) Perform an operation from a system controller and confirm whether a connected device can be operated normally. (1) Confirm that there is no incorrect wiring of the signal lines from the meters.
  • Page 16 This product is designed and intended for use in the residential, commercial and light-industrial environment. This product at hand is • Low Voltage Directive 73/23/EEC based on the following • Electromagnetic Compatibility Directive EU regulations: 2004/108/EC NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules.

This manual is also suitable for:

Pac-yg60mca

Table of Contents