11.3. Visual/Audible Inspection (while cycling the barrier) ................6 11.4. Barrier Disassembly ..........................6 Key Contacts ..............................7 Appendix A - G-4033P Maintenance and Inspection Checklist ................1 Appendix B – Spare/Replacement Parts ......................... 1 Appendix C – Deployment and Recovery ......................1 Please Refer to Contract Plans and Documents for Specific Details.
30mph. The M30 P3 Portable Drop Arm Barrier is listed and approved on the USACE Department of Defense (DOD) Anti-Ram Barrier list. The Gibraltar M30 P3 Portable Drop Arm Barrier is a great option for rapid deployment at locations such as downtown corridors, festivals, stadiums, conventions, etc. that need hostile vehicle mitigation surrounding their perimeter.
12V battery source. The G-4033P M30 P3 Portable Drop Arm Barrier is capable of 200 complete up/down cycles per hour and can change direction when cycling. The cycle rate for opening and closing is adjustable.
9. System Operation 9.1. Barrier Operation 9.1.1. Gibraltar provides a basic two-button wired remote control capable of controlling a single barrier. More complex control panels can be custom made at an additional cost. 9.1.2. Basic control functionality includes: •...
Fill oil reservoir with new filtered oil 1/2” from the top of the sight glass. • Hydraulic fluid is not provided by Gibraltar, 1-2 gallons are required to fill the system, use AW-46 type hydraulic fluid. Note: The trailered barrier version requires 2-3 gallons.
Turn the System power OFF. Lock the control box so power cannot be reapplied. 11.2.1. Follow the G-4033P Maintenance and Inspection Checklist Appendix A. 11.2.2. See Appendix B for spare or replacement parts. 11.3. Visual/Audible Inspection (while cycling the barrier) 11.3.1.
• Blocking assembly should not be removed from frame for the life of the product unless it is determined to be necessary after consulting with Gibraltar. • Support the arm assembly to prevent the assembly from falling once the pivot pin is removed.
Appendix A - G-4033P Maintenance and Inspection Checklist G-4033P Maintenance and Inspection Checklist G-4033P Common Inspection and Maintenance Checklist This checklist is used to maintain the quality of your Gibraltar G-4033P Portable Drop Arm in accordance with Gibraltar’s standards and Warranty requirement. Facility Name:...
G-4033P Drop Arm Pivot Pin Bushing 4000-LED-12 12Ft. Clear Opening Drop Arm LED Strip 4000-BMPR Drop Arm Bumper Pads HYDCYL-2X16 G-4033P Hydraulic Cylinder CLEVIS-HD Hydraulic Cylinder Clevis Pin Contact Gibraltar (+830-798-5444) if replacement parts are required. G-4033P Owner’s Manual REV 1...
Appendix C – Deployment and Recovery CONTINUE TO THE NEXT STEP IF THE BARRIER MUST BE ROTATED Back barrier into desired deployment area, DEPLOY trailered barrier as follows: Remove the pins from the three hydraulic risers (2 32. Move the Riser/Arm selector valve to the RISER tongue side, 1 rear) position Unlock and open the control cabinet top cover...
Page 12
RECOVER the trailered barrier as follows: 30. Perform a final walk around of drop arm trailer to If the barrier was rotated using the turn table, ensure: accomplish steps 31 – 37 before continuing. Ensure the mode selector switch is in TRAILER mode No parts or tools are left on the trailer All risers are retracted and secured...
Need help?