Download Print this page

PatioTree Palmeira Instructions Manual

Hardtop gazebo with double roof

Advertisement

Quick Links

10'X12 Palmeira Hardtop Gazebo
With Double Roof

Advertisement

loading

Summary of Contents for PatioTree Palmeira

  • Page 1 10'X12 Palmeira Hardtop Gazebo With Double Roof...
  • Page 2 Pg.2...
  • Page 3 1.Two or more people are required 2.You will need one or more stepladders. for assembly. 4.You may need a safety hat. 3. Wearing protective gloves is recommended. 6. Please use a Phillips 5.Use the hex keys in the box. screwdriver. 8.For ease of construction, you 7.Do not fully tighten screws may need to use a drill.
  • Page 4 DESCRIPTION Pole Beam Beam Beam Beam Union Bar Corner Roof Bar Roof Bar Roof Bar Roof Bar Finishing Bar Finishing Bar Finishing Bar Finishing Bar Finishing Bar Finishing Bar Pg.4...
  • Page 5 DESCRIPTION Finishing Bar Finishing Bar Finishing Bar Solidifying Bar Solidifying Bar Outside Roof Connector Inside Roof Connector Corner Solidifying Bar Corner Solidifying Bar Plate Iron Angle Iron Angle Supporting Pla Lock Hook Corner Cover Pg.5...
  • Page 6 DESCRIPTION Joint Cover Finishing End Finishing End Finishing End Finishing End Mosquito Sidewall Solid Sidewall Screw M6X35 Screw M6X15 Screw M6X15(D17X32) Screw M5X10 Screw ST4.8X12 Allen wrench Wrench Screw Driver Pg.6...
  • Page 7 DESCRIPTION Panels Panels Panels Panels Panels Panels Panels Panels Panels Panels Panels Pg.7...
  • Page 8 Step 1: Set up poles (Part A) with plates (Part M1) using screws (V) as shown in diagram. Pg.8...
  • Page 9 Step 2: 1.Put 8 hooks (Part Q) to each slot of sidewall track (Part B&B1). Connect (Part B1) and (Part B) into one beam using union bar (Part D) screws (V). 2.Put 7 hooks (Part Q) to each slot of sidewall track (Part C&C1).
  • Page 10 Step 3: Use screws (X&V) to connect poles and beams together as shown in diagram. Pg.10...
  • Page 11 Step 4: Finish connecting beams using corner covers (Part W) and screws (Y) as shown in diagram. Affix middle beams using joint cover (Part W1) and screws (Y&T) as shown in diagram. Pg.11...
  • Page 12 Step 5: Affix the frame with corner solidifying bars (Part L1 and L2) using screws (V). Pg.12...
  • Page 13 Step 6: 1.Connect the inside roof connect (Part K1) with the corner roof bar (Part E) using screws (V) as shown in dragram. 2.Attach supporting (M4) and corner roof bar using screws (V). Pg.13...
  • Page 14 Step 7: Attach corner roof bar (Part E) to main frame using screws (V) as shown in diagram. Pg.14...
  • Page 15 Step 8: 1.Attach roof bar (Part E1&E2&E3) to main frame using screws (V) as shown in diagram. 2.Attach roof bar (Part E1) to inside roof connector (Part K1) using screws (V) as shown in diagram. Pg.15...
  • Page 16 Step 9: 1.Connect outside roof connector (Part K) to inside roof connector (Part K1) using screws (U) as shown in diagram. 2.Affix solidifying bar (Part H&I) to croner roof bar (Part E) using iron angle (M2 and M3) and screws V as shown in diagram.
  • Page 17 Step 10: Affix finishing bar (Part F2&F4&F5&F6) to roof bar (Part E&E1) using finish end (W3 and W4) and screws V as shown in diagram. F2 F4 Pg.17...
  • Page 18 Step 11: Insert panels P,P1,P2 into the roof sticks E,E1. Pg.18...
  • Page 19 Step 12: Attcch finishing bar (Part F&F1&F2&F3) to upper roof with finishing end (Part W2&W3) screws V as shown in diagram. Pg.19...
  • Page 20 Step 13: Overall Roof Assembly Start from N3 and install piece by piece in a clockwise sequence. Only N and N1 can joinly insert into the slot. Fit N2 and N4 from top to the slot. Pg.20...
  • Page 21 Step 14: Insert panels N3,N5,N6,N7 into the roof sticks E,E1,E2,E3. Pg.21...
  • Page 22 Step 15:1.Please note assemble N2 and N4 firstly, and then assemble N and N1. 2.Affix roof panels using plalock (Part Q1) as shown in diagram. E/E1 E/E1 Pg.22...
  • Page 23 Step 16: Attcch finishing bar (Part F2&F7&F8)to upper roof with finishing end (Part W2&W3&W5) screws V as shown in diagram. Pg.23...
  • Page 24 Step 17: Hang up mosquito sidewall (Part Z3) as shown in diagram. Step 18: Hang up solid sidewall (Part Z4) as shown in diagram. Pg.24...
  • Page 25 PEAKHOME FURNISHINGS INC. 970 Roosevelt #202, Irvine, CA 92620 www.peakhomefurnishings.com Check out more great products: www.peakhomefurnishings.com CONTACT US; WE’RE HERE 7 DAYS A WEEK TO HELP YOU! 1-818-963-1558 phf@peakhomefurnishings.com If we missed you call, please leave a detailed message including your name and phone number.