To simplify future maintenance, ensure all plumbing connections around the bath are easily accessible. This bath conforms to ASME A112.19.1./CSA B45.2. All dimensions are nominal. Kallista reserves the right to make revisions in the design of products without notice, as specified in the Price Book. 1008431-2-C...
Carefully lay out and cut the rough deck material. For Freestanding Installations: Install the finished flooring and wall materials. For All Installations: Position the plumbing according to the roughing-in information. Cap the supplies, and check for leaks. Kallista 1008431-2-C...
Page 4
Install the drain to the bath according to the drain manufacturer’s instructions. Do not connect the trap at this time. Position a clean drop cloth or similar material in the bottom of the bath. Be careful not to scratch the surface of the bath. Move the bath into place. 1008431-2-C Kallista...
Fill the bath to the overflow and check for leaks. 5. Complete the Installation For Drop-in Installations Cover the framing with water-resistant wall material. Seal the joints between the bath rim edges and the water-resistant wall material with silicone sealant. Tape and plaster the water-resistant wall material. Kallista 1008431-2-C...
Page 6
Install the finished wall. Seal the joints between the bath rim and the finished wall with silicone sealant. Allow the silicone sealant to cure before using the bath. Refer to the silicone sealant manufacturer’s instructions for cure time. 1008431-2-C Kallista...