HBE -DC120KW02ST/U-DC Instruction Manual

Charging pile

Advertisement

Quick Links

SHENZHEN HB Electronic CO.,LTD
HBE-DC120KW02ST/U-DC Charging Pile Instruction Manual
Catalogue
Safety Precautions......................................................................................2
1.Brief account..................................................................................2
2. Equipment parameters............................................................................2
3. Schematic diagram.................................................................................3
4. Shape Model Diagram...........................................................................4
6. Charging operation....................................................................................................6
6.1 Charging operation flowchart............................................................
6.2 Operation interface for starting charging mode....................................7
6.3 Setting Parameters Process...................................................................8
8. User maintenance instructions................................................................12
Charging piles for electric vehicles
foundation installation...............................5
page 1 , in total page 12
6
.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HBE-DC120KW02ST/U-DC and is the answer not in the manual?

Questions and answers

Summary of Contents for HBE HBE-DC120KW02ST/U-DC

  • Page 1: Table Of Contents

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles HBE-DC120KW02ST/U-DC Charging Pile Instruction Manual Catalogue Safety Precautions..................2 1.Brief account..................2 2. Equipment parameters................2 3. Schematic diagram.................3 4. Shape Model Diagram................4 5.Dimension instructions of foundation installation.......5 6. Charging operation....................6 6.1 Charging operation flowchart............
  • Page 2: Safety Precautions

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles Safety Precautions 1.Do not bring dangerous items such as inflammable, explosive, or combustible materials, chemicals, and combustible steam near charging piles. 2.Keep the head of the charging gun clean and dry. If there is any dirt, please wipe it with a clean dry cloth.
  • Page 3: Schematic Diagram

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles Operating Temperature -20~55℃ Relative Humidity ≤95% Protection Class IP54 The protection of leakage, over voltage, over current ,under Safety Design voltage, emergency stop, full stop charging, short circuit, over temperature. Installation Mode Floor-type Interfaces Count Two (the line is 5 meters)
  • Page 4: Shape Model Diagram

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles 4.Shape Model Diagram page 4 , in total page 12...
  • Page 5: Dimension Instructions Of Foundation Installation

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles 5.Dimension instructions of foundation installation 5.1 The pile installation needs to be surrounded by an operating space of not less than 1 meter. 5.2 Charging piles must be installed on customized concrete. 5.3 The height of concrete installation should be 250MM above the horizontal ground and the vertical inclination of installation should not exceed 5 degrees.
  • Page 6: Charging Operation

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles 6.Charging operation 6.1 Charging operation flowchart page 6 , in total page 12...
  • Page 7: Operation Interface For Starting Charging Mode

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles Boot Interface Charging number selection Scan the QR code Swiping card Return Return Card identification Return >1805s QR code interface Card number information Return Return The last charge settlement The Charging connection was abnormal.
  • Page 8: Setting Parameters Process

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles QR code. Specific operation examples are as follows: a. Charging by swiping card Click any position on the screen to enter the charging mode selection interface. Click the scan code option to enter the QR code interface.
  • Page 9 SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles Click Stop charging to enter the settlement interface Click OK to enter the charging end interface 6.3Parameter setting process Click continuously in the upper right, then choose the language to jump to the password input interface.
  • Page 10 SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles Click Save to return to the charging parameter setting interface Click Save to return to the power parameter setting interface Click Save to return to the device parameter setting interface. Click Save to enter the interface for setting rate period parameters.
  • Page 11: Operating Instructions And Use Of Emergency Stop Switch

    SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles Click Save to enter the extended parameter setting interface . Click Save to enter the interface for setting other parameters. After setting parameters, click Save to return to the first interface. Scan QR code for charging mode Scan the QR code on the pile body directly with applet of WeChat .
  • Page 12: User Maintenance Instructions

    8.User maintenance instructions 8.1Instructions The maintenance of DC charging pile developed by HBE is relatively simple. During operation, attention should be paid to ventilation and heat dissipation and keep the environment clean. There should be no explosive dangerous medium in the air, and no gas enough to corrode metal and destroy insulation.
  • Page 13 SHENZHEN HB Electronic CO.,LTD Charging piles for electric vehicles should be checked. In addition to checking the wiring according to the drawings, it is also necessary to check whether the components are loose or fall off, whether the connection is strong, whether the contact is good due to transportation and other reasons.

Table of Contents