Download Print this page

Millennium KONTI Quick Start Manual

Bath fillers & bath fillers with hand shower

Advertisement

Quick Links

GENERIC INSTRUCTIONS FOR INSTALLATION OF
MILLENNIUM BATH FILLERS & BATH FILLERS WITH
HAND SHOWERS ON CONCRETE FLOORS
KONTI/AKEMI/CIOSO/KIATO
BATH FILLERS & BATH FILLERS
WITH HAND SHOWER
Important Information
• Hot and cold water inlet pressures should be equal.
• Maximum static water pressure is 500kpa - AS/NZS3500.1-2003(clause 3.3.4).
If water pressure exceeds 500kpa warranty is voided.
• Lines must be flushed out prior to installation of the mixer. Damage caused to the
mixer by copper filings/foreign matter coming through the pipework is not covered
under warranty.
• Maximum hot water temperature is 80C.
Cleaning Instructions
1. Under no circumstances should tapware be installed using acetone silicone
2. Never clean Mixers/Tapware/Showers/Accessories using harsh detergents/cleaning
products, citrus based cleaning products or abrasive cleaning pastes.
3. Where your tapware remains dry in use, a soft 100% cotton cloth can be used to remove
dust
4. Alternatively, wipe over with a soft 100% cotton cloth using tepid water with a small
amount of liquid soap added (2% liquid soap maximum). Using a different cotton cloth
thoroughly rinse off all soap mix using cold water. To finish wipe off all residual water with
another dry cotton cloth

Advertisement

loading
Need help?

Need help?

Do you have a question about the KONTI and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Millennium KONTI

  • Page 1 GENERIC INSTRUCTIONS FOR INSTALLATION OF MILLENNIUM BATH FILLERS & BATH FILLERS WITH HAND SHOWERS ON CONCRETE FLOORS KONTI/AKEMI/CIOSO/KIATO BATH FILLERS & BATH FILLERS WITH HAND SHOWER Important Information • Hot and cold water inlet pressures should be equal. • Maximum static water pressure is 500kpa - AS/NZS3500.1-2003(clause 3.3.4).
  • Page 2 INSTALLATION Step 3 IMPORTANT INFORMATION Secure the floor mounts to the floor, ensuring the mount is square and level to finished floor Recessed measurements - Minimum 40mm with finished floor. (refer to levelling bubble on top plate). Tighten. Min. 40mm Important! Please ensure pressure test has been conducted before moving onto Step 4.
  • Page 3 INSTALLATION Step 6 Step 9 Screw both water pipes into the body of the Secure the mixer to the floor mount mixer, ensuring that the correct pipe is using the screws that were removed connected to the correct inlet hole earlier.

This manual is also suitable for:

AkemiCiosoKiato