Download Print this page

HyLoft SuperPro 00164 Assembly Instructions

Ceiling mounted shelf

Advertisement

Quick Links

Preparation and Safety Information
IMPORTANT-READ THROUGH ENTIRE INSTRUCTIONS BEFORE BEGINNING INSTALLATION
Safety:
Read and understand the warning on your stepladder and make sure the ladder is in good working
order.
Examine all tools needed to insure they are in proper working order before starting.
Power tools that are not internally grounded require power cords and extension cords with a ground
prong.
Always wear eye protection when drilling or installing parts.
HyLoft
components are made of metal so beware of any sharp edges and do not let any components
make contact with electrical current during installation.
DO NOT install more than one
HyLoft
unit on any two framing members.
Preparation:
The
HyLoft
unit can be installed in any area of garage, provided there is adequate space. When
possible install so that all four sides are accessible for convenient loading.
Take care not to block attic or crawl space access, or lights.
If ceiling height allows for it, the unit may also be installed above the open garage door . If installing
above an open door, measure between the highest point of the opening garage door and the ceiling to
determine if there is adequate room for the unit. You will need at least 25 inches of open space
between the ceiling and the highest point of the door during operation.
Clear the area where the
HyLoft
unit is to be installed, and don't leave autos parked under the unit
during installation.
Locate any gas, electrical, and plumbing lines in the garage before drilling holes in the drywall.
NOTE: We refer to Joists throughout the instructions. Joists are also called Ceiling Studs or Framing
Members.
Knape & Vogt®
Grand Rapids, MI 49505 USA
1-800-253-1561
For more information
, accessories
and frequently asked questions, visit our web site:
www.Hyloft.com

Advertisement

loading
Need help?

Need help?

Do you have a question about the SuperPro 00164 and is the answer not in the manual?

Questions and answers

Summary of Contents for HyLoft SuperPro 00164

  • Page 1 Power tools that are not internally grounded require power cords and extension cords with a ground prong. Always wear eye protection when drilling or installing parts. HyLoft components are made of metal so beware of any sharp edges and do not let any components make contact with electrical current during installation.
  • Page 2: Parts Included

    ASSEMBLY INSTRUCTIONS SuperPro 48" X 96" Ceiling Mounted Shelf Item # 00164 Joists 24" to 42" apart Parts Included: IMPORTANT-Read through entire instructions before beginning any installation. 4-Downrods-Straight 2-Left Facing Downrods with Feet 4-Wire Grids 4-Angle Brackets 24" x 48" 2-Right Facing Downrods with Feet 44-Hex Bolts 5/16"...
  • Page 3 IMPORTANT-READ THROUGH ENTIRE INSTRUCTIONS BEFORE BEGINNING INSTALLATION Locate the ceiling joists in the area of desired installation and determine the direction in which they are running. The ceiling Angle Brackets(B) are installed parallel to the ceiling joists. Refer to the diagram below for additional installation clarification.
  • Page 4 ATTACH SUPPORT FRAMES Place two 48" Support Frames(F) on top of feet and using Clamps(K) with thick part up, fasten to downrod using Hex Bolts(L) and Nuts(J). Make sure ends of Support Frames(F) are even and square. Place 96" Support Frames(G) on top of 48" Support Frames (F) and loosely bolt together in each corner using ¼"...
  • Page 5: Alternate Installations

    Support Frames(F&G) will be level when installed. Continue with Steps 3 & 4. Knape & Vogt® Grand Rapids, MI 49505 USA 1-800-253-1561 For more information , accessories and frequently asked questions, visit the our web site: www.Hyloft.com...