1
2
SELECT THE BEST LOCATION
MONO BLOC UNIT INSTALLATION
Install the Mono bloc unit in outdoor locations only.
Mono bloc unit will become heavy when fi lled with water. Please install the unit on a strong concrete fl oor and consider the
weight of the unit and water.
Avoid installations in areas where the ambient temperature may drop below -20°C.
Fix Mono bloc unit on the concrete fl oor with M12 anchor bolt at 4 locations.
The Mono bloc unit must be installed on a fl at, solid surface.
Pull-out strength of these anchor bolts must be above 15000N.
A place removed from any heat source or steam which may effect the operation of the
Mono bloc unit.
A place where air circulation is good.
A place where drainage can be easily done.
A place where Mono bloc unit's operation noise will not cause discomfort to the user.
A place which is accessible for maintenance.
Ensure to keep minimum distance of spaces as illustrated, from wall, ceiling, or other
obstacles.
A place where fl ammable gas leaking might not occur.
A place where the Mono bloc unit's piping and wiring lengths come within reasonable
ranges.
DISPOSAL OF MONO BLOC UNIT DRAIN WATER
If an awning is built over the unit to prevent direct sunlight or rain, be careful that heat
radiation from the condenser is not obstructed.
When a Drain elbow 1 is used, please ensure to follow below:
Do not place any obstacles which may cause a short circuit of the discharged air.
- The unit should be placed on a stand which is taller than 50mm.
- Cover the 8 holes (ø20mm) with Rubber cap 2 (refer to illustration below)
Avoid installing the Mono bloc unit at a location where suction side may be exposed
- Use a tray (fi eld supply) when necessary to dispose the Mono bloc unit drain water.
directly to wind.
If Mono bloc unit installed near sea, region with high content of sulphur or oily location
(e.g. machinery oil, etc.), it lifespan maybe shorten.
When installing the product in a place where it will be affected by
typhoon or strong wind such as wind blowing between buildings,
including the rooftop of a building and a place where there is no
building in surroundings, fi x the product with an overturn prevention
wire, etc. (Overturn prevention fi tting model number: K-KYZP15C)
If the unit is used in an area where temperature falls below 0°C for 2 or 3 consecutive days, it is recommended not to use
the Drain elbow 1 and Rubber cap 2, for the drain water freezes and the fan will not rotate.
3
PIPING INSTALLATION
WARNING
This section is for authorized and licensed electrician / water system installer only. Work behind the Cabinet Front Plate f secured by screws must only be carried out under supervision of qualifi ed contractor,
installation engineer or service person.
Typical Piping Installation
Temporary connection to be
Double Check Valve assembly
removed immediately after filling
is acceptable in house
Servicing
Servicing
Valve
Fan Coil Unit
Radiator /
Floor Heater
2-Way Valve
Tank
Please engage a licensed water circuit installer to install this water circuit.
This water circuit must comply with relevant European and national regulations (including EN61770), and local building regulation codes.
Ensure the components installed in the water circuit could withstand water pressure during operation.
Do not apply excessive force to piping that may damage the pipes.
Use Rp 1¼" nut for both water inlet and water outlet connection and clean all piping with tap water before connecting to the Mono bloc unit.
Cover the pipe end to prevent dirt and dust when inserting it through a wall. If an existing tank is to be connected to this Mono bloc unit, ensure the pipes are clean before water pipe installation is carried out.
Choose proper sealer which can withstand the pressures and temperatures of the system.
Make sure to use two spanners to tighten the connection. Tighten the nuts with torque wrench: 117.6 N•m.
If non-brass metallic piping is used for installation, make sure to insulate the piping to prevent galvanic corrosion.
Do not use pipes that are crushed or deformed. If these inferior pipes are used, it may cause unit malfunction.
Make sure to insulate the water circuit piping (insulator thickness : 20mm or more) to prevent condensation during cooling operation and reduction of heating capacity, as well as avoid freezing of the outdoor
water circuit piping during winter season.
After installation, check the water leakage condition in connection area during test run.
In case of a power supply failure or pump operating failure, drain the system (as suggested in the fi gure below).
When water is idle inside the system,
freezing up is very likely to happen
which could damage the system.
H
< H
Drainage piping installation
Use a drain hose with inner diameter of 15 mm.
The hose must be installed in a continuously downward direction and left open to the frost-free atmosphere.
If drain hose is long, use a metal support fi xture along the way to eliminate the wavy pattern of drain tube.
Water will drip from this hose, therefore the outlet of this hose must be installed in an area where the outlet cannot become blocked.
Do not insert this hose into sewage or drain pipe that may generate ammonia gas, sulfuric gas, etc.
If necessary, use a hose clamp to tighten the hose at drain hose connector to prevent it from leaking.
5
INSTALLATION OF REMOTE CONTROLLER
Mounting The Remote Controller
Installation Location
For exposed type
Install at the height of 1 to 1.5 m from the fl oor (Location where average room
Preparation: Make 2 holes for screws using a driver.
temperature can be detected).
Mount the top case.
Install vertically against the wall.
Align the claws of the top
Avoid the following locations for installation.
case and then align the claws
of the bottom case.
1. By the window, etc. exposed to direct sunlight or direct air.
2. In the shadow or backside of objects deviated from the room airfl ow.
Cut here with
a nipper and
3. Location where condensation occurs (The Remote Controller is not
remove the burr
moisture proof or drip proof.)
with a fi le.
4. Location near heat source.
5. Uneven surface.
Claw (2 places)
Keep distance of 1 m or more from the TV, radio and PC. (Cause of fuzzy
INSTALLATION OF REMOTE CONTROLLER
image or noise)
Remote Controller 3 Wiring
Hole for screw
Mono bloc unit
Screw
(fi eld supply)
Remote Controller
1
2
Remote Controller
Connect the remote control
wiring (fi eld supply)
wiring
No polarity
Arrange the wires along the groove
of the case.
Terminal for Remote Controller wiring
Remote Controller cable shall be (2 x min 0.3 mm²), of double insulation PVC-
sheathed or rubber sheathed cable. Total cable length shall be 50 m or less.
Be careful not to connect cables to other terminals (e.g. power source wiring
Top case
(Back side)
Bottom case
terminal). Malfunction may occur.
(Back side)
Do not bundle together with the power source wiring or store in the same metal
tube. Operation error may occur.
6
INSTALLATION OF NETWORK ADAPTOR AND BASE PAN HEATER
2. Insert a fl at head screwdriver into the slot on the top of the adaptor and
Network Adaptor 6 and 7 Installation (Optional)
remove the cover. Connect the other end of the CN-CNT cable connector to
the connector inside the adaptor.
1. Open the Cabinet front plate f, then connect the Network Adaptor Cable 7
to the CN-CNT connector on the printed circuit board.
Slot
Pull the cable out of the Mono bloc unit so that there is no pinching.
If an optional PCB has been install in the Mono bloc unit, connect the CN-CNT
Connector
connector to Optional PCB 4.
Network
Adaptor
Network
cable
INSTALLATION OF NETWORK ADAPTOR AND BASE PAN
Adaptor
cable
3. On the wall near the Mono bloc unit, attach
PCB 1
the adaptor by screwing screws through the
holes in the back cover.
Bind all
lead wires
CAUTION
240-250V
CAUTION
240-250V
with these
bands
4. Pull the CN-CNT cable through the hole in
the bottom of the adaptor and re-attach the
A
B
WARNING
A
B
WARNING
ABCDEFGHJMFLG
front cover to the back cover.
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
L
N
L
1
N
1
POWER SUPPLY 1
POWER SUPPLY 2
L
N
L
1
N
1
POWER SUPPLY 1
POWER SUPPLY 2
Without Optional PCB
With Optional PCB
4
CONNECT THE CABLE TO MONO BLOC UNIT
This section is for authorised and licensed electrician only. Work behind the cabinet front plate f secured by screws must only be carried out under supervision of qualifi ed contractor,
installation engineer or service person.
Grip anchor bolt
Embedded anchor bolt
Remove The Cabinet Front Plate f
60mm
Anchor bolt
Anchor bolt
or more
(1) Remove the 4 mounting screws as shown in the illustration.
Broken stone
Floor
(2) Slide the cabinet front plate f downward to release the pawls. Then, pull it toward
80mm
Concrete
300mm
Above
front to remove it.
or more
20mm
Floor slab (concrete)
Compress strength of concrete is above 18MPa {180kgf/cm
2
}
Fixing of Power Supply Cord
Illustration of grip type and embedded type anchor bolt
(REFER TO WIRING DIAGRAM AT UNIT FOR DETAIL)
1. An isolating device must be connected to the power supply cable.
Isolating device (Disconnecting means) should have minimum 3.0 mm contact gap.
Connect the approved polychloroprene sheathed power supply 1 cord and power supply 2 cord and type designation 60245 IEC 57 or heavier cord to the terminal board, and to the
other end of the cord to isolating device (Disconnecting means). See below table for cable size requirement.
Model
WH-MXC09J3E5 and WH-MXC12J6E5
2. To avoid the cable and cord being damaged by sharp edges, the cable and cord must be passed through the designated holes before being connected to the terminal block.
3. Secure the cable onto the control board with the holder (clamper).
Drain elbow
1
Terminal on the Mono bloc unit
Rubber cap
2
x 8
(Power Supply Cord)
Terminals on the isolating device from
power supply (Disconnecting means)
WIRE STRIPPING AND CONNECTING REQUIREMENT
Wire stripping
(gap between wires)
No loose strand
when insert
Terminal screw
M4
M5
Valve
*1 - Earth wire must be longer than other cables
for safety reasons.
Main Water
Supply
Connecting with external device (optional)
All connections shall follow to the local national wiring standard.
It is strongly recommended to use manufacturer-recommended parts and accessories for installation.
For connection to main PCB 1
1. Two-way valve shall be spring and electronic type, refer to "Field Supply Accessories" table for details. Valve cable shall be (3 x min 1.5 mm
heavier, or similarly double insulation sheathed cable.
* note: - Two-way Valve shall be CE marking compliance component.
- Maximum load for the valve is 9.8VA.
2. Three-way valve shall be spring and electronic type. Valve cable shall be (3 x min 1.5 mm
* note: - Shall be CE marking compliance component.
- It shall be directed to heating mode when it is OFF.
- Maximum load for the valve is 9.8VA.
3. Room thermostat cable must be (4 or 3 x min 0.5 mm
4. Maximum output power of booster heater shall be ≤ 3 kW. Booster heater cable must be (3 x min 1.5 mm
5. Extra pump cable shall be (2 x min 1.5 mm²), of type designation 60245 IEC 57 or heavier.
6. Boiler contact cable / defrost signal cable shall be (2 x min 0.5 mm²), of type designation 60245 IEC 57 or heavier.
7. External control shall be connected to 1-pole switch with min 3.0 mm contact gap. Its cable must be (2 x min 0.5 mm
* note: - Switch used shall be CE compliance component.
- Maximum operating current shall be less than 3A
CAUTION
8. Tank sensor shall be resistance type, please refer to graph below for the characteristic and details of sensor. Its cable shall be (2 x min 0.3 mm
strength of min 30V) of PVC-sheathed or rubber-sheathed cable.
Do not over tighten, over tightening cause water leakage.
Drain hose
connector
Drain hose
Illustration of how to fi x
drain hose to Mono bloc unit
For embedded type
Preparation: Make 2 holes for screws using a driver.
Mount the bottom case
to the wall.
Mount the top case.
Pass the wire through the hole
Align the claws of the top
Mount the bottom case to
case and then align the claws
in the centre of the bottom case.
the wall.
of the bottom case.
Avoid the wire
being caught.
U P
U P
Claw (2 places)
Wall to which
the remote
controller is
fi xed
Hole for
screw
Screw
Claw (2 places)
(fi eld supply)
Claw (2 places)
Connect the remote
Remote controller
terminal board
control wiring
Clamper
Remove the coating.
Top case
(fi eld supply)
Approx. 6 mm
(Back side)
Bottom case
Pass through
(Back side)
the hole
Make sure the wiring
connection is in the correct
direction.
Remote controller terminal board
WARNING
Remove the coating. Approx. 6 mm
This section is for authorized and licensed electrician only. Work behind the Cabinet
Front Plate
f
secured by screws must only be carried out under supervision of qualifi ed
Remove the sheath. Approx. 180 mm.
contractor, installation engineer or service person.
Make sure the wiring connection is in the
correct direction.
5. Use the included cord clamp to fi x the CN-CNT cable to the wall.
Pull the cable around as shown in the diagram so that external forces cannot
act on the connector in the adaptor. Use the included cable tie to fi x the cables
together.
CAUTION
240-250V
A
B
ABCDEFGHJMFLG
WARNING
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
L
N
L
1
N
1
POWER SUPPLY 1
POWER SUPPLY 2
HEATER
Cord clamp
Cable tie
Screws
Base Pan Heater 5 (Optional)
It is strongly recommended to install a Base Pan Heater 5 (optional) if the Mono
bloc unit is installed in cold climate area. Refer the Base Pan Heater 5 (optional)
installation instruction for details of installation.
CN-CNT cable
(Take care not to
pinch the cable)
WARNING
Cabinet front plate
Mounting screws
Power Supply Cord
Cable Size
Isolating Devices
Recommended RCD
1
3 x min 4.0 mm
2
30A
30mA, 2P, type A
2
3 x min 4.0 mm
2
30A
30mA, 2P, type AC
L
N
L
N
CONNECTING REQUIREMENT
1
1
WH-MXC09J3E5
L
N
L
N
1
1
This equipment's Power Supply 1 complies with IEC/EN 61000-3-12 provided that the short circuit power
S
is greater than or equal to 1900kW at the interface point between the user's supply and the public
sc
Power Supply 1
Power Supply 2
system. It is the responsibility of the installer or user of the equipment to ensure, by consultation with
the distribution network operator if necessary, that the equipment is connected only to a supply with a
short circuit power S
greater than or equal to 1900kW.
sc
The equipment's Power Supply 1 complies with IEC/EN 61000-3-11 and shall be connected to a suitable
Conductor
Conductor
Conductor not
supply network, having services current capacity  100A per phase. Please liaise with supply authority
fully insert
over insert
fully insert
Terminal
that the service current capacity at the interface point is suffi cient for the installation of the equipment.
board
The equipment's Power Supply 2 complies with IEC/EN 61000-3-2.
The equipment's Power Supply 2 complies with IEC/EN 61000-3-3 and can be connected to current
5 mm or
supply network.
more
WH-MXC12J6E5
ACCEPT
PROHIBITED
PROHIBITED
This equipment's Power Supply 1 complies with IEC/EN 61000-3-12 provided that the short circuit power
S
is greater than or equal to 1900kW at the interface point between the user's supply and the public
sc
system. It is the responsibility of the installer or user of the equipment to ensure, by consultation with
Tightening torque
the distribution network operator if necessary, that the equipment is connected only to a supply with a
cN•m {kgf•cm}
short circuit power S
greater than or equal to 1900kW.
sc
The equipment's Power Supply 1 complies with IEC/EN 61000-3-11 and shall be connected to a suitable
157~196 {16~20}
supply network, having services current capacity  100A per phase. Please liaise with supply authority
196~245 {20~25}
that the service current capacity at the interface point is suffi cient for the installation of the equipment.
This equipment's Power Supply 2 complies with IEC/EN 61000-3-12.
The equipment's Power Supply 2 complies with IEC/EN 61000-3-11 and shall be connected to suitable
supply network, with the following maximum permissible system impedance Z
*1
the interface. Please liaise with supply authority to ensure that the Power Supply 2 is connected only
to a supply of that impedance or less.
Power Supply Cord
2
), of type designation 60245 IEC 57 or
2
), of type designation 60245 IEC 57 or heavier, or similarly double insulation sheathed cable.
2
), of type designation 60245 IEC 57 or heavier cord, or similarly double insulation sheathed cable.
2
), of type designation 60245 IEC 57 or heavier.
2
), double insulation layer of PVC-sheathed or rubber-sheathed cable.
.
rms
2
), double insulation layer (with insulation
Tank Sensor Resistance Vs Temperature
16000
14000
12000
10000
8000
6000
4000
2000
0
-30 -20 -10
0
10
20
30
˚C
Tank sensor characteristic
8
RECONFIRMATION
EXPANSION VESSEL 7 PRE PRESSURE CHECKING
WARNING
[Upper limit water volume of the system]
The Mono bloc unit has a build-in Expansion Vessel with 10 L air capacity and initial
Be sure to switch off all power supply before performing each of the below checkings. Before
pressure of 1 bar.
obtaining access to terminals, all supply circuits must be disconnected.
Total amount of water in the system should be below 200 L.
CHECK WATER PRESSURE
*(0.1 MPa = 1 bar)
If the total amount of water is more than 200 L, please add expansion vessel (fi eld supply).
Water pressure should not lower than 0.05 MPa (with inspects the Water Pressure Gauge 4). If
In the case of using antifreeze agent, expansion rate
necessary add tap water into the water circuit.
Please refer to the antifreeze agent maker for the expansion rate
upper limit water volume of the system.
The expansion vessel capacity required for the system can be calculated from the
CHECK PRESSURE RELIEF VALVE a
formula below.
Check for correct operation of Pressure Relief Valve a by turning on the lever to become
horizontal.
If you do not hear a clacking sound (due to water drainage), contact your local authorized dealer.
Push down the lever after fi nish checking.
In case the water keeps drained out from the unit, switch off the system, and then contact your
local authorized dealer.
[Adjustment of the initial pressure of the expansion vessel when there is a difference in
installation height]
If the height difference between the Mono bloc unit and the highest point of the system
water circuit (H) is more than 7m, please adjust the initial pressure of the expansion
7
vessel (Pg) according to the following formula.
CHARGING THE WATER
CHECK RCCB 2
Ensure the RCCB 2 set to "ON" condition before check RCCB 2.
Turn on the power supply to the Mono bloc unit.
Make sure all the piping installations are properly done before carry out below steps.
This testing could only be done when power is supplied to the Mono bloc unit.
1. Open Cabinet front plate f to access to the Pressure Relief Valve a and Air Purge Valve b
2. Turn the plug on the Air Purge Valve b outlet anticlockwise by one complete turn from
Be careful not to touch parts other than RCCB test button when the power is supplied
fully closed position.
to Mono bloc unit. Else, electrical shock may happen.
Plug (turn
anticlockwise by
one complete
turn)
This product contains fl uorinated greenhouse gasses.
Refrigerant type : R32 (GWP=675)
Air purge valve b
For WH-MXC09J3E5 and WH-MXC12J6E5
Amount : 1.6kg (1.080 ton CO
3. Set the Pressure Relief Valve a level "DOWN".
Pressure relief
Pressure
valve a
relief valve a
Lever
Lever
or
Turn down
Turn down
Pressure relief valve a
Pressure relief valve a
4. Start fi lling water (with pressure more than 0.1 MPa (1 bar)) to the Mono bloc unit via water
inlet. Stop fi lling water if the free water fl ow through Pressure Relief Valve a drain hose.
5. Turn ON the power supply and make sure Water Pump 5 is running.
6. Check and make sure no water leaking at the tube connecting points.
7. Reinstall the Cabinet front plate f by tightening the 2 mounting screws.
9. Room sensor zone 1 cable shall be (2 x min 0.3 mm²) double insulation layer of PVC-sheathed or rubber-
sheathed.
10. Outdoor air sensor cable shall be (2 x min 0.3 mm²) double insulation layer of PVC-sheathed or rubber-sheathed.
11. Tank OLP cable must be (2 x min 0.5 mm
2
), double insulation layer of PVC-sheathed or rubber-sheathed cable.
Power Supply 1 cord
Apply cut
Power Supply 2 cord
Remote controller cable
Mounting
Optional cables:
screws
External control cable
f
Tank sensor cable
Bushing e x 6
Room sensor zone 1
Outdoor air sensor cable
Tank OLP cable
Optional cables:
3-way valve cable
2-way valve cable
Room thermostat zone 1 cable
Booster heater cable
Extra pump cable
Boiler contact cable /
Defrost signal cable
How to guide optional cables and power supply cords to Bushing e
PCB 1
Power supply 2
RCCB
Bind all lead
CAUTION
240-250V
wires with
these bands
Bind all lead wires
with these bands
Power supply 1
RCCB
A
B
WARNING
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
Holder
L
N
1
L
N
1
(Clamper)
POWER SUPPLY 1
POWER SUPPLY 2
= 0.193 ohm () at
Power Supply 1 cord
max
Power Supply 2 cord
Remote controller cable
Optional cables:
Optional cables:
3-way valve cable
External control cable
2-way valve cable
Tank sensor cable
Room thermostat zone 1 cable
Room sensor zone 1
Booster heater cable
Outdoor air sensor cable
Extra pump cable
Tank OLP cable
Boiler contact cable /
Defrost signal cable
How to guide optional cables and power supply cords
(view without internal wiring)
For connection to optional PCB 4
1. By connecting optional PCB, 2 Zone temperature control can be achieved. Please connect mixing valves,
water pumps and thermistors in zone 1 and zone 2 to each terminals in optional PCB.
Temperature of each zone can be controlled independently by remote controller.
2. Pump zone 1 and zone 2 cable shall be (2 x min 1.5 mm²), of type designation 60245 IEC 57 or heavier.
3. Solar pump cable shall be (2 x min 1.5 mm²), of type designation 60245 IEC 57 or heavier.
4. Pool pump cable shall be (2 x min 1.5 mm²), of type designation 60245 IEC 57 or heavier.
5. Room thermostat zone 1 and zone 2 cable shall be (4 x min 0.5 mm²), of type designation 60245 IEC 57
or heavier.
6. Mixing valve zone 1 and zone 2 cable shall be (3 x min 1.5 mm²), of type designation 60245 IEC 57 or heavier.
7. Room sensor zone 1 and zone 2 cable shall be (2 x min 0.3 mm²), double insulation layer (with insulation
strength of minimum 30V) of PVC-sheathed or rubber-sheathed cable.
8. Buffer tank sensor, pool water sensor and solar sensor cable shall be (2 x min 0.3 mm²), double insulation
layer (with insulation strength of minimum 30V) of PVC-sheathed or rubber-sheathed cable.
9. Water sensor zone 1 and zone 2 cable shall be (2 x min 0.3 mm²), double insulation layer of PVC-sheathed
or rubber-sheathed cable.
10. Demand signal cable shall be (2 x min 0.3 mm²), double insulation layer of PVC-sheathed or rubber-sheathed
cable.
9
TEST RUN
1. Before test run, make sure below items have been checked:-
a) Pipework are properly done.
b) Electric cable connecting work are properly done.
c) Mono bloc unit is fi lled up with water and trapped air is released.
2. Antifreeze agent must be added into water circuit to prevent freezing of water when outdoor ambient temperatures is low. Recommended antifreeze:
Propylene glycol: 40% (equivalent to -20°C)
Without antifreeze agent condition
3. Set ON to the Mono bloc unit and RCCB 2. Then, for remote control operation please refers to (Mono bloc) Air-to-Water Heatpump's operation instruction.
Note:
With antifreeze agent condition
During winter, turn on the power supply and standby the unit for at least 15 minutes before test run.
is different depending on its maker.
Allow suffi cient time to warm up refrigerant and prevent wrong error code judgement.
TEST RUN
before calculate the
4. For normal operation, Water Pressure Gauge 4 reading should be in between 0.05 MPa and 0.3 MPa.
5. After test run, please clean the Magnetic Water Filter Set c. Reinstall it after fi nish cleaning.
CHECK WATER FLOW OF WATER CIRCUIT
x Vo
V =
98 + P
Confi rm the maximum water fl ow during main pump operation not less than 15 l/min.
1 -
1
98 + P
*Water fl ow can be check through service setup (Pump Max Speed)
2
V : Required gas volume <expansion vessel volume L>
[Heating operation at low water temperature with lower water fl ow may trigger "H75" during defrost process.]
Vo : System total water volume <L>
RESET OVERLOAD PROTECTOR 0
: Expansion rate 5
60˚C
= (depends on antifreeze agent used)
P
: Expansion tank fi lling pressure
= (100) kPa
Overload Protector 0 serves the safety purpose to prevent the water over heating. When the Overload Protector 0 trip
1
P
: System maximum pressure
= 300 kPa
at high water temperature, take below steps to reset it.
2
- (
) Please confi rm at actual place
1. Take out the cover.
- The gas volume of the sealed type expansion vessel is presented by <V>.
2. Use a test pen to push the centre button gently in order to reset the Overload Protector 0.
It's advised to add 10% margin for required gas volume of calculation.
3. Fix the cover to the original fi xing condition.
10
MAINTENANCE
Pg= (H*10+30) kPa
In order to ensure optimal performance of the unit, seasonal inspections on the unit, functional check of RCCB, fi eld wiring and piping have to be carried
out at regular intervals. This maintenance should be carried out by authorized dealer.
Maintenance for Magnetic Water Filter Set c
WARNING
1. Remove the Cover g by loosening the mounting screws to access to the Magnetic Water Filter Set c.
2. Turn OFF power supply.
3. Set the two valves for the Magnetic Water Filter Set c to "CLOSE".
Push the "TEST" button on the RCCB 2. The lever would turn down and indicate "0",
4. Take off the clip, then gently pull out the mesh. Beware of small amount water drain out from it.
5. Clean the mesh with warm water to remove all the stain. Use soft brush if necessary.
if it functions normal.
6. Reinstall the mesh to the Magnetic Water Filter Set c and set back the clip on it.
Contact authorized dealer if the RCCB 2 malfunction.
7. Set the two valves for the Magnetic Water Filter Set c to "OPEN".
Turn off the power supply to the Mono bloc unit.
8. Turn ON power supply.
If RCCB 2 functions normal, set the lever to "ON" again after testing fi nish.
9. After cleaning, reinstall the Cover g by tightening the mounting screws properly.
Do not add or replace other than R32 type. It may cause product damage, burst, injury and etc. Use compatible
R32 tools for refrigerant piping work and refrigerant charging during installation or servicing.
equivalent)
2
CHECK ITEMS
Is the connecting cable fi xed to terminal board fi rmly?
Is the connecting cable clamped fi rmly?
Is the earth wire connection properly done?
Is water pressure higher than 0.05 MPa?
Is the Pressure Relief Valve a operation normal?
Is the RCCB operation normal?
11. SG signal cable shall be (3 x min 0.3 mm²), double insulation layer of PVC-sheathed or rubber-sheathed cable.
12. Heat/Cool switch cable shall be (2 x min 0.3 mm²), double insulation layer of PVC-sheathed or rubber-
sheathed cable.
13. External compressor switch cable shall be (2 x min 0.3 mm²), double insulation layer of PVC-sheathed or
rubber-sheathed cable.
Optional cables:
from
Mixing valve zone 1 cable
optional
Optional cables:
PCB
Mixing valve zone 2 cable
Optional cables:
Room sensor zone 1 cable
Room sensor zone 2 cable
Buffer tank sensor cable
Pool sensor cable
Water sensor zone 1 cable
from
Water sensor zone 2 cable
optional
Demand signal cable
PCB
Solar sensor cable
SG signal cable
Heat/Cool switch cable
External Compressor
switch cable
Optional cables:
Pump zone 1 cable
Pump zone 2 cable
from
Solar pump cable
optional
Pool pump cable
PCB
Error signal cable
Room thermostat zone 1 cable
Room thermostat zone 2 cable
How to guide optional cables to bushing e
CAUTION
240-250V
A
B
WARNING
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
ABCDEFGHJMFLG
L
N
L
1
N
1
POWER SUPPLY 1
POWER SUPPLY 2
Pump zone 1 cable
Room sensor zone 1 cable
Pump zone 2 cable
Room sensor zone 2 cable
Solar pump cable
Buffer tank sensor cable
Pool pump cable
Pool sensor cable
Error signal cable
Water sensor zone 1 cable
Room thermostat zone 1 cable
Water sensor zone 2 cable
Room thermostat zone 2 cable
Demand signal cable
Mixing valve zone 1 cable
Solar sensor cable
Mixing valve zone 2 cable
SG signal cable
Heat/Cool switch cable
External Compressor switch cable
How to guide optional cables (view without internal wiring)
Terminal screw on PCB
Maximum tightening torque cN•m {kgf•cm}
M3
50 {5.1}
M4
120 {12.24}
Use test pen to push this
button for reset Overload
Protector 0.
Cover g
WARNING
Mounting
screws
Is the power supply voltage within the rated voltage range?
Is there any abnormal sound?
Is the heating operation normal?
Is the thermostat operation normal?
Is the remote control LCD operation normal?
ENGLISH
Is the Mono bloc unit water leak free on test run?
ACXF60-41770-AA
2/36
PRINTED IN MALAYSIA

Advertisement

loading

This manual is also suitable for:

Wh-mxc12j6e5