Operation Checks And Component Replacementprocedures - Technics SL-EH560 Service Manual

Hide thumbs Also See for SL-EH560:
Table of Contents

Advertisement

5 Operation Checks and Component
Replacement/Procedures
TOP PREVIOUS NEXT
This section describes procedures for checking the operation of the major printed circuit boards and
replacing the main components.
For reassembly after operation checks or replacement, reverse the respective procedures. Special
reassembly procedures are described only when required.
/
5.1 Checking for the main P.C.B.
5.2 Checking for the CD servo P.C.B.
5.3 Replacement for the traverse deck ass'y
5.4 Replacement for the belt, loading motor ass'y and loading switch
•@
TOP PREVIOUS NEXT

Advertisement

Table of Contents
loading

Table of Contents