Installer Quick Guide & Registration Important • Failure to install the Showersave QB1-21 as specified may impact on the Energy Performance Certificate at the end of construction. • Failure to correctly register this installation with the Showersave Installation App (see page 10) may invalidate product warranty and result in financial loss.
The Showersave QB1-21 included in the design SAP calculation is the highest performing WWHR unit in its category. Substitution with a “generic” alternative from another manufacturer will impact on the Energy Performance Certificate at the end of construction.
WWHRS unit and another to a nearby Boiler or Service cupboard. Optimum performance is achieved when the Showersave QB1-21 is installed as per these instructions. Your SAP Assessor will usually have specified the installation of the Showersave QB1-21 in System A (See Diagram overleaf).
Page 4
For System A, connect the Showersave QB1-21 to the waste outlet of the shower tray (or bath) after the waste trap and before the soil vent pipe (SVP). The incoming cold main then enters the bottom of the outer water jacket, with the “warmed”...
Installation guidance & photos 1) Install the Showersave QB1-21 vertically to a solid surface, using the 2 brackets and 10mm studs supplied. 2) Ensure the 2 push fit connectors on the waste pipe (1 x 45° and 1 x 90°) are positioned as per the photos below, with the 45⁰...
Page 6
Home Buyers EPC report. Failure to do this can invalidate the installation. Once installed, the QB1-21 installation must be registered via the Showersave App. Follow guidance on page 9.
The space it is installed in should be large enough so that inspection can be carried out. Access should be possible without too much work. 5) The cold to the base of the QB1-21 can come from above or from a location on the same floor.
The Showersave App allows installers to register installations onsite and should take less than one minute per registration. It is a requirement of the Building Regs Part L (2021) that the installation of the Showersave QB1-21 must be registered. Failure to comply may result in financial loss.