Page 4
Preparing the endoscope for leak testing Before Leak Testing, remove the (optional) LCD screen. Then screw on the water-resistant cap attached the top of operating handle. Leak Testing...
Page 5
Cleaning and Disinfecting Endoscopes Always attach the water resistant cap and leak tester before leak testing and cleaning! Dry Leak Test : Attach leak tester to endoscope connector, tighten knob, pump until dial is at 12:00 position, if dial remains in place for 2 minutes, there are no leaks.
Page 6
Plug the endoscope light guide connector into the WE-200 and plug the water bottle into the water bottle connection. Attach the air / water cleaning adapter cap (attached to the diagram card) to the air / water cylinder.
Page 7
WE-200 Semi Portable Processor / Light Source The WE-200 processor is a combination of image, light and air. The digital images are reproduced in very high resolution. The outputs on this device enable the video image to be sent to a variety of displays.
Page 8
Air Output: When the endoscope is connected to the WE-200 and the pump switch is in the ON position the air and water feature is enabled.
Need help?
Do you have a question about the WE-200 and is the answer not in the manual?
Questions and answers