Advertisement

Quick Links

www.hotjet.cz
Heat pump installation
HOTJET MINI 5Ai
HOTJET CZ s.r.o.
HJ mini 5Ai installation v1
Page :
1
of
16

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MINI 5Ai and is the answer not in the manual?

Questions and answers

Summary of Contents for Hotjet MINI 5Ai

  • Page 1 Heat pump installation HOTJET MINI 5Ai HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 2: Table Of Contents

    14.Circulation pump parameters 15.Parameters of the 3-way valve 16.Built-in electric boiler 17.Hydraulic integration 18.Warranty, Post Warranty Terms and Conditions and Liability for Defect 19.EC declaration of conformity to the heat pump HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 3: Read This First

    ⚠ Never cover the heat pump - its air intake and exhaust Congratulation on your purchase of the Hotjet heat pump. To have to stay free of obstacles. maximize the time the heat pump will work for you, you should ⚠...
  • Page 4: Economical Operation Conditions

    18 °C. The first 2 heating seasons in new or renovated structures can have of up to 50% higher heat consumption requirements, which have to be covered by a bivalent source. HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 5: Content Of The Delivery

    R410A fluoridated coolant, registered by the Kyoto Protocol. The coolant GWP is: 2088. The coolant does not contain Freon (CFC) and it is inflammable. Coolant can be handled only by appropriately qualified persons HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 6: Transport

    Report any discovered damages to the given hauling company and request their examination. Send a copy of the report to HOTJET CZ, s. r. o. Once you receive the pump at the given delivery address, use (if possible) a pallet cart for transporting the heat pump to its final...
  • Page 7 Sání MIN600 There are eyes 1 and 2 at its bottom part for possible anchoring of your heat pump to the bottom holes in the wall. Anchoring is 
 • HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 8: Air Intake And Exhaust

    0.25 m has to be condensate discharge in these areas will have to be heated ensured, i.e. 0.049 m2. using a heating cable. HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 9: Connection To A Heating System

    ⚠ Heat pump Hotjet MINI 5Wi is normally equipped with Installation without service personnel present internal circulation pump Grundfos UPM3 25-70 or another This installation method applies to, for example, cottages and circulation pump with similar parameters.
  • Page 10: Disassembly Of The Heat Pump Cover

    • In order to ensure long-term, safe and economical operation of equivalent. the heat pump, you have to observe the manufacturer’s ⚠ technical conditions and to install it in accordance with the given project. HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 11: Preparation For Putting Into Operation

    Make sure water does not come into contact with the heating system. The expansion container does not form a part electric parts. of the heat pump delivery. HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 12: Inspection Prior To The Heating Season

    Liquidation of the device should be entrusted to a professional cooling company or to the manufacturer. The product includes certain media (coolant, oil), which have to be liquidated in the Heating system: prescribed manner. HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 13: Circulation Pump Parameters

    15. Parameters of the 3-way valve A three-way Honeywell valve for switching the hot water heating is integrated to the heat pump. Its drive has been designed for 230 V and Kvs = 7.7. HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 14: Hydraulic Integration

    (ID9) odvod kondenzátu a odpad z pojišťovacího ventilu Diagram with a compensatory reservoir výfuk sání Zásobník ohřevu TV TČ Topný okruh Termostat (ID9) odvod kondenzátu a odpad z pojišťovacího ventilu HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...
  • Page 15: Warranty, Post Warranty Terms And Conditions And Liability For Defect

    The costs associated with repairs shall not be paid by HOTJET. Parts and materials to which the claim relates shall be send by the buyer to the HOTJET’s address without any delay.
  • Page 16: Ec Declaration Of Conformity To The Heat Pump

    19. EC declaration of conformity to the heat pump HOTJET CZ s.r.o. HJ mini 5Ai installation v1 Page :...

Table of Contents