Seller authorised CARAVAGGI importer . 2. You are required to present the guarantee duly filled in or the bill , if this is not avaiable . 3. The claim will be completed by the Dealer , who will forward it to the Manufacturer .
Page 3
SPARES REQUEST Fill in . Owner ________________________________________ __________________________________________________ Owner _______________________________________ __________________________________________________ Seller ____________________________________________ __________________________________________________ Date of start up ___________________________________ Type of breakage __________________________________ Description of spares ____________________ Q.ty _____ Num. / code _______________________________________ Serial number _____________________________________...
Page 4
INDEX 1 – INTRODUCTION PAG. 4 2 – DIMENSIONS , WEIGHT AND TRANSFERS POINT PAG. 5 3 - TRANSFERS AND SYMBOLS PAG. 6 4 – SAFETY REGULATIONS PAG. 8 5 – ASSEMBLY PAG. 10 6 – START – UP PAG. 11 7 –...
Page 5
1. INTRODUCTION PREAMBLE Thank you for buying a CARAVAGGI BIO - SHREDDER . Caravaggi have been manufacturing shredding and compost equipment for many years and are now able to offer a full range . CARAVAGGI BIO - SHREDDERS are designed to last a long time and run very safely provided that the instructions herein are carried out to the letter .
Page 6
2. DIMENSIONS , WEIGHT AND TRANSFERS POINTS Electric model Engine model LENGTH 1200 LENGTH 1200 WIDTH WIDTH HEIGHT 1030 HEIGHT 1030 WEIGHT WEIGHT 1 - HOPPER 2 - BAFFLE DISCHARGE 3 – AXLE FRAME 4 - WHEELS 5 - MACHINE FRAME 6 - ELECTRIC MOTOR / ENGINE...
1. Read this booklet carefully before using the Bio - Shredder . If you mislay it apply for another copy from : CARAVAGGI , Via M. Adamello , 20 - I - 25037 Pontoglio - BS . 2. DO NOT ALLOW children or anyone else who is not authorized or acquainted with the instructions to use the machine .
Page 10
. 18. Only perform the routine maintenance work specified herein . Contact a Caravaggi dealer for major repairs or other maintenance . 19. Before starting up , make sure there are no foreign bodies in the shredding chamber to prevent start up and rotation .
Page 11
5. ASSEMBLY 1 - Remove all the components of the Bio-Shredder from their packing. 2 - Insert the hopper (1) in its position by locking the nuts .
Page 12
6. START-UP 1 - Use the top hopper, to move the machine around. First slightly press it downwards, to balanced and then move it. 2 - Place the Bio-Shredder on a flat stable surface (fig. 5). 3 - When filling with oil or fuel, always follow the instructions in the booklet provided.
Page 13
7. OPERATING INSTRUCTIONS 1 - In order to prevent clogging, do not overfill the hopper (Fig. 7). Drop the material into the loading hopper, never force it . 2 - Never try to insert anything over 5 cm in diameter into the loading hopper.
8. EXTRAORDINARY MAINTENANCE All maintenance must be carried out with the motor or engine off , in compliance with the relevant safety standards . With an electric motor , unplug the power cable . With an engine , remove the spark plug . 8.1 REPLACING THE CHIPPING BLADE •...
9. TROUBLE-SHOOTING PROBLEM WHAT TO DO 1 The Bio-Shredder will not start B + C + E 2 It is difficult to start or looses power C + D 3 The revs drop and the Bio-Shredder A + B + C + D misfires 4 Excessive vibration 5 Reduced output...
10. MAINTENANCE SCHEDULE START OF START OF END OF EACH EACH EACH SEASON OPERATION SEASON 1 - CHECK ENGINE See booklet booklet booklet 2 - CHECK ELECTRIC MOTOR • • 3 - CHECK SCREWS, • GUARDS, HOPPERS, ETC. • • 4 - CHECK KNIFE WEAR •...
11. SPARES LIST POS DESCRIPTION Q.TY CODE Electric motor 015300210 Washer Ø 8x24 510003005 Screw TE M 8x16 500019608 Screw TSPEI M 8x60 500000870 Screw TE M 8x30 501830010 Spacer L = 28 060004100 Lock nut M 8 520002008 Screw TE M 8x25 500025008 Engine 060004300...
12. DECLARATION OF CONFORMITY The company Caravaggi , hereby declares under its own responsability , that the machine BIO - SHREDDER Type Bio 50 electric and petrol versions , complies with the Basic Safety and Health Requirements prescribed in EC Directive 89/336 and 89/392 and subsequent modifications thereto 89/686 , 91/368 , 93/44 and 93/68.
Page 20
CARAVAGGI MACCHINE INDUSTRIALI Via Monte Adamello , 20 I – 25037 Pontoglio ( BS ) Tel . 030 / 7470464 - Fax 030 / 7470004 Email info@caravaggi.com http:// www.caravaggi.com 0297...
Need help?
Do you have a question about the BIO 50 and is the answer not in the manual?
Questions and answers
Caravaggio bio-50 Engine Maintenance: How to Lubricate