Summary of Contents for Master Garden Island Bar BBI-6
Page 1
(4) 38” Long (Shelf D) Hardware included: 4” Bolts– 10 5” Bolts– 18 5 5/8” Bolts– 8 Tools Needed: Phillips Screw Driver Wrench Continue to setup instructions on the next page Master Garden Products 3223 C. ST. NE Suite #1 Auburn, WA 98002 www.mastergardenproducts.com...
Page 2
Setup Instructions Bamboo dowel Bamboo Shelf Setup 1.) First setup the outside panels numbered 1-5 using the bolts provided (The sizes do vary because of inconsistencies in the bamboo, longer bolts may be required. Use as required. 2.) Insert the Bamboo Dowels where indicated for shelves A and B, there will be two lev- els of shelves that would need to be installed in each side.