Download Print this page

Advertisement

Quick Links

INST ALLA TION GUIDE
Gaius Duo
17751N
17751N
320104
20104
x8
20108
20209
20210
x8
20114
M8 x 12
20127
20118
20128
5/2019

Advertisement

loading

Summary of Contents for Gaius Duo 17751N

  • Page 1 INST ALLA TION GUIDE Gaius Duo 17751N 17751N 320104 20104 20108 20209 20210 20114 M8 x 12 20127 20118 20128 5/2019...
  • Page 2 Structure The product has undergone static load testing at 400 kg. The minimum size of the wall mounting fixtures is ≥45 x ≥195 x (700) mm. The fixtures must be affixed to solid structures. The fixtures must be mounted in accordance with the measurements specified in the diagram. Electrics The electrical junction box must be positioned to the left of the mid-line, as shown in the drawing.
  • Page 3: Connect Electricity

    Connect electricity: Authorised personnel only! 230 V Motor Remote 230 V Affix the frame to the wall:...
  • Page 4 Install the cistern and the water hose: Testing up & down Mind the water pipes...
  • Page 5 Measure the pipes: L1+L2+7 = L3...
  • Page 6 Install drainage:...
  • Page 7 Measure the pipes: 65 mm + L2 ø 90 min 105 mm ø 110 ø 90 50 mm 55 mm...
  • Page 8 min 88 mm...
  • Page 9 Mount the cover, seat and support rails:...
  • Page 10 Mount the toilet roll holder, remote control and push button: ‘CLICK’ ‘CLICK’ ‘CLICK’...
  • Page 11 BSP 1/2 Do not try to unclog any blockage via the toilet bowl as this may damage the flexible pipe. Always perform unclogging by moving the implement in the direction of the building’s drain pipes.