Download Print this page

Advertisement

Quick Links

Proper Uncoiling - Manual Method
Minimum 2 people required
NT handrail will be delivered coiled as two independent bundles. These bundles will divide the
handrail in half (or quarters for longer handrails) and will be tied with plastic bands.
Instructions:
1. Lift the top bundle up and to
one side.
3. Remove the plastic ties.
All of our handrails are backed by an
industry leading warranty. For more
warranty information, scan the QR
code on the left or visit:
http://www.ehc-global.com/warranty
NT Handrail Handling & Installation Guide
Please ensure that
the crossover coil is
always on the bottom
before starting.
2. Lift the bottom bundle where shown to the other side.
4. Uncoil the handrail completely, unrolling both sides together.
Do not bend
the handrail
tightly or twist,
as it may
deform.
www.ehc-global.com/contact
Rev 1.00 08/17

Advertisement

loading

Summary of Contents for EHC NT

  • Page 1 Proper Uncoiling - Manual Method Minimum 2 people required NT handrail will be delivered coiled as two independent bundles. These bundles will divide the handrail in half (or quarters for longer handrails) and will be tied with plastic bands. Please ensure that...
  • Page 2 Do not remove the protective plastic film until after installation. This will protect the finish of the handrail during the installation procedure. Handrail Set-up and Tensioning NT handrails require a minimum level of tension Too loose: to operate properly. They should generally be If the handrail installed somewhat tighter (10 –...