Installation manual
FIMER ELECTRA DC Station
60-150 kW

Advertisement

Table of Contents
loading

Summary of Contents for Fimer ELECTRA DC Station 60

  • Page 1 Installation manual FIMER ELECTRA DC Station 60-150 kW...
  • Page 2 FIMER is not responsible for any loss of the equipment, or part of it, that is not used according to the regulations and laws in force in the country of installation.
  • Page 3 READ THE MANUAL – The personnel assigned to use, maintain and install the equipment must be qualified by FIMER (by means of a letter attesting to their qualification) for the activities described and must reliably demonstrate their ability to correctly interpret the contents of this manual.
  • Page 4: Table Of Contents

    Table of content General informations 1.1 ......................Field of use 1.2 ................... Symbols and definitions 1.3 ............Product dimensions and characteristics 1.4 .......................Support Safety and equipment 2.1 ....................Safety warnings 2.2 ....................Compliant use 2.3....................Product handling Installation 3.1 .................. Preparing for installation 3.2....................Tools required 3.3 ....................
  • Page 5 Troubleshooting Maintenance 7.1 ..................Maitenance schedule Commissioning Decommissioning and disposal Technical data...
  • Page 6: Field Of Use

    Field of use FIMER is not liable for damages of any kind that may arise from incorrect or reckless operations. FORBIDDEN – The equipment may not be used for a purpose that does not conform to that envisaged in the field of use.
  • Page 7 • Protection against electric shock: Class I • Charging type: Mode 3 according to IEC 61851-1 and Mode 4 according to IEC 61851-23 and IEC 61851-24. ATTENTION – When installing in TN-earthing systems, there may be additional specific local regulations regarding system safety and failure protection that the installer must understand and implement.
  • Page 8: Symbols And Definitions

    1.2 Symbols and definitions In this manual and/or in some cases on the equipment, dangerous zones/components are indicated by signs, labels, symbols or icons. Symbol Description GENERAL WARNING THE ORIGINAL MANUAL OR OTHER ADDITIONAL DOCUMENTATION MUST BE CONSULTED PROHIBITION OR RESTRICTIONS The operations described must be carried out using the clothing and/or protective equipment provided by the employer The products should not be disposed of with household waste,...
  • Page 9: Product Dimensions And Characteristics

    Product dimensions and characteristics FRONT VIEW SIDE VIEW RH SIDE VIEW LH REAR TOP VIEW BOTTOM VIEW FIMER ELECTRA DC Station Weight [kg] 333 kg 355 kg 378 kg 400 Kg Dimensions LxHxW [mm] 697 x 1853 x 644 mm...
  • Page 10: Support

    1.4 Support For any further information or request for support, FIMER is available through the dedicated section of the website www.fimer.com or by writing to service.emobility@FIMER.com.
  • Page 11: Safety And Equipment

    FIMER and its affiliates are not liable for damages or losses related to such security breaches, any unauthorized access, interference, intrusion, leakage or theft of data or information.
  • Page 12: Product Handling

    This document has been carefully checked by FIMER, but deviations cannot be completely ruled out. If errors are detected, the reader is kindly requested to notify FIMER. Other than under explicit contractual commitments, in no event shall FIMER be responsible or liable for any loss or damage resulting from the use of this manual or from the installation of the equipment.
  • Page 13: Installation

    (in the most serious cases, injuries can be fatal). Before proceeding with the installation, start-up and use of the product, you should carefully read the instructions in this manual. FIMER recommends using experienced professionals, who comply with current regulations, to install the product correctly.
  • Page 14: Tools Required

    • Forklift truck or crane and respective belts for the handling and positioning ATTENTION – FIMER declines all responsibility for damages to property or persons deriving from the use of these instruments. The installation must be carried out by qualified personnel and in accordance with the regulations in force for the installation of electrical equipment.
  • Page 15: Unpacking

    The following images are for illustrative purposes only; they may not show all internal components of the product or present negligible differences from the actual configuration. ATTENTION – Notify the carrier and FIMER support immediately if rough handling of the equipment is suspected or if any damage is found or suspected.
  • Page 16: Anchor Device Installation

    ShockWatch and TiltWatch devices indicate if the package was subject to shock or tip-over 2000 1. Remove the panels and the roof unscrewing the fixing screws. 2. Remove fastening belts (if any). 3. Remove protective film and bumper being careful not to scratch the station surface. 4.
  • Page 17: Installation On Existing Ground

    3.6.1 Installation on existing ground 1. Place the template on the ground where you want to install the product (in any case respecting the indications previously provided about positioning) and letting the corrugated pipe come out of the ground for about 3-5cm. N°...
  • Page 18: Installation In Fresh Concrete

    9. Fix the station to the ground as shown in section 3.7. ATTENTION – The station cannot be lifted from the bottom once removed from pallet; for lifting and positioning , use the eyebolts on the roof. 3.6.2 Installation in fresh concrete 1.
  • Page 19: Station Fixing

    3.7 Station fixing 1. Remove the cover plates on both sides under the access doors. 2. Remove the hexagonal sleeves, or M12 nuts, depending on the type of installation, place the fixing plates (in blue in the picture), then screw them back to anchor the station to the ground.
  • Page 20 3. Mounting the cover plates. 4. Once the station is installed in its final position, remove the eyebolts and replace them with the supplied M12x20 screws, as shown in the figures below. Eyebolt M12x20 (DIN 580) TPR Washer 37x13 thk 3 mm (DIN 125) Stainless Steel Screw M12x20 (DIN 933)
  • Page 21: Power And Grounding Cord Connection

    Main Disconnector @40°C = 200 A RCBO (Q0) I = 250 A = 0.8xI = 5xI ELECTRA DC Station 60 RCCB (Q6) RCCB (Q10) = 80 A = 100 A = 0.03 A – Tipo B = 0.03 A – Tipo A ∆n...
  • Page 22 Station Model RCBO (Q0) I = 250 A = 0.9xI = 5xI = 0.3 A – t = 200 ms ∆n RCCB (Q6) ELECTRA DC Station 90 =80 A 3xMCB =0,03 A – Tipo B (Q1, Q2, Q3) ∆n =50 A – Curve C MCB (Q7) = 6 kA =80 A –...
  • Page 23 0A/01/23 ELECTRA_DC_STATIONS H.M.Rgsnlnns F.Yligo� N.Csòlòls TJOHMF MJOF EJBHSBN (TME) SINGLE_LINE_DIAGRAMS 16/12/22 FIMER s.p.a. via J.F. Kennedy, 26 TIFFU FMFDUSBaEDaTUBUJPOT 20871 Vimercate MB - ITALY SLD) This document is Work Product under the Agreement between TOTAL E&P MOÇAMBIQUE AREA SFY. EBUF...
  • Page 24 MBTU SFYJTJPO 0A/01/23 ELECTRA_DC_STATIONS TJOHMF MJOF EJBHSBN (TME) H.M.Rgsnlnns F.Yligo� N.Csòlòls SINGLE_LINE_DIAGRAMS 16/12/22 FIMER s.p.a. via J.F. Kennedy, 26 TIFFU FMFDUSBaEDaTUBUJPOT 20871 Vimercate MB - ITALY SLD) This document is Work Product under the Agreem SFY. EBUF EFTDSJRUJPO RSFRBSFE C_...
  • Page 25 0A/01/23 ELECTRA_DC_STATIONS TJOHMF MJOF EJBHSBN (TME) H.M.Rgsnlnns F.Yligo� N.Csòlòls SINGLE_LINE_DIAGRAMS 16/12/22 FIMER s.p.a. via J.F. Kennedy, 26 TIFFU FMFDUSBaEDaTUBUJPOT 20871 Vimercate MB - ITALY SLD) This document is Work Product under the Agreement between TOTAL E&P MOÇAMBIQUE A SFY. EBUF...
  • Page 26 TJOHMF MJOF EJBHSBN (TME) H.M.Rgsnlnns F.Yligo� N.Csòlòls SINGLE_LINE_DIAGRAMS 16/12/22 FIMER s.p.a. via J.F. Kennedy, 26 TIFFU FMFDUSBaEDaTUBUJPOT 20871 Vimercate MB - ITALY SLD) This document is Work Product under the Agreement between TOTAL E&P MO SFY.
  • Page 27 Below is a description of procedure for correct operation of the station at power supply and ground plant arranged in the installation site. 1. Open both the access doors (right and left side) using the supplied keys, as shown in figure. 2.
  • Page 28 NOTE – The pictures above refer to ELECTRA DC Station 60 equipped with Main disconnector; different version is equipped with main Circuit Breaker. Different ELECTRA DC Station models have the same cable entry position but are equipped with different number and size of cable glands.
  • Page 29: First Startup And Configuration

    ATTENTION – FIMER considers the information provided at the time of purchase to be final and, consequently, any configuration changes or any other necessary actions that were not agreed upon or defined at the time of purchase will not be included in the guarantee.
  • Page 30 2. Before proceeding with the start-up of the charging station, carry out the following checks, keeping the main disconnector/main circuit breaker and mainstream switches in the “OFF” position: a. For ELECTRA DC Station 60 only, check the status of the main residual current circuit breaker to protect DC plug.
  • Page 31 b. Turn on the UPS by pressing the power button. c. Close the right-side door. 5. Power up the station by setting the protection switch located upstream of the station to the “ON” position. After completing the procedure described above, the charging station will perform internal checks. Once the checks are finished, the HMI will display the availability of the various Plugs as shown in figure.
  • Page 32: Instruction For Use

    5. Instruction for use ATTENTION – The pictures below are for illustrative purposes only and may not show all internal components installed in the product. Operations prior to charging ATTENTION – Throughout the charging process, DO NOT remove the charging connector from the electric vehicle.
  • Page 33 Plug holder. Display RFID FIMER ELECTRA DC Station will allow the user to start charging session using a RFID technology card or by remotely enabling via OCPP (RemoteStart Transaction). STATUS LED Above each Plug Holder there is an LED that provides information on the status of the Plug itself...
  • Page 34 • In case of successful enablement, the charging station will start searching for a vehicle. • For CCS2 and T2 plugs, press the button (shown in red in the pictures below) to release the cable. • Connect the chosen plug from those available to your vehicle (Operation to be completed within 30 seconds).
  • Page 35 • After a few seconds, the charging begins showing the following message, in case of DC charging, containing the main information about the state of the charging session • In case of AC charging, the Battery SoC information will not be available, so the screen will be as follows •...
  • Page 36 • Once the charging session is completed, the following message will be displayed • When it is possible to remove the plug, its LED will be flashing green and the display will show the following message. REMOTE AUTHORISATION You must follow the chosen service provider instruction for remote authorisation through APP or other.
  • Page 37: Errors Or Authorisation Failure

    5.3 Errors or authorisation failure If any error occurs at the beginning of charging session, the following image will appear on the display of the station which identifies a failure into authorisation. If one of the station doors is open or the emergency button has been pressed intentionally or erroneously, the station will block any charging session in progress and immediately make all the Plugs unavailable, displaying the following messages on display respectively.
  • Page 38 If anomalies occur emergency button must be pressed, and message above will be displayed. This way the charging session will end immediately. Press Release If the message “temporarily unavailable” appears on the station display, the failure may arise due to multiple situations.
  • Page 39 Plug will be available again. READ THE MANUAL – For additional details regarding error codes or failures management, please refer to the User Guide available by contacting the contacts provided in section 1.4 or by connecting to www.fimer.com.
  • Page 40 The proper operation and life of the product depend on periodic maintenance and inspection, according to the following program. To perform this maintenance, please contact a qualified FIMER technician. ATTENTION – A register of use/maintenance of the device is suggested, keeping track of the operations carried out and the components replaced.
  • Page 41 Maitenance schedule ATTENTION – If damages are encountered, immediately stop the use of the charging station, reporting its unavailability, proceeding with the repairing. WARNING – The continued operation may cause serious personal injury and property damage. ATTENTION – Use only the original reparation kit and replacement components. WARNING –...
  • Page 42 Commissioning is the last phase necessary to start up the charging station. The objective of this phase is to check the safe operation of charging station for its operating purpose. Commissioning activities must be carried out by FIMER personnel or FIMER-qualified personnel, by means of a letter certifying their qualification.
  • Page 43 The following operations must be carried out with the station disconnected, verify the absence of voltage by means of voltage detection. • Check the status (OFF) of the protection switches. If they are ON, set them to OFF. • In the picture below it is in state 1 (ON), but it is only a sample picture and refers to 60 kW model. •...
  • Page 44 • Check that the main disconnect switch or circuit breaker is set to status 0 (OFF). In the picture below it is in state 1 (ON), but is only a sample picture. Main disconnect switch for ELECTRA DC STATION 60 Main circuit breaker for ELECTRA DC STATION 120 and 150 •...
  • Page 45 9. Decommissioning and disposal The product must be used and subsequently disposed of in accordance with the regulations in force for the treatment of waste electrical and electronic equipment (WEEE) or any other regulations in force in the country of installation (in accordance with Directive 2012/19/EU). ATTENTION –...
  • Page 46 • Standard IEC61851-1, IEC61851-21-2, IEC61851-23, IEC61851-24 Certification CE, RCM, UL 1) Please contact FIMER to check the availability of different rated voltages 2) For installation above 2000 m please contact FIMER 3) Please contact FIMER to check the certification status...
  • Page 48 With regard to purchase orders, the agreed your local FIMER or utilization of its contents – in whole or in parts particulars shall prevail. FIMER does not accept representative or visit: – is forbidden without prior written consent of any responsibility whatsoever for potential errors FIMER.