Do you have a question about the MULTIPOINT SHD833 and is the answer not in the manual?
Questions and answers
Summary of Contents for SEERS MULTIPOINT SHD833
Page 1
MULTIPOINT MODEL: SHD833 INSTALLATION MANUAL * Please read manual carefully before installation. * SEERS reserve the rights to change the contents and illustrative diagrams without prior notice.
CONTENT Introduction Important Safety Information Part Contents Checklist Electrical Requirements Water requirements Installation Operating mode Troubleshooting Model Speci cation...
INTRODUCTION Congratulation! Thank you for making excellent choice by purchasing the Seers Eco Hot Water Dispenser. This is low power consumption water heater. The design is carefully crafted for its distinctive use in all household, hotel and any applicable vicinity.
IMPORTANT SAFETY INFORMATION THIS APPLIANCE MUST BE EARTHED, TO MAKE SURE EARTH WIRE AND HEATER UNIT HAVE PROPER GROUNDING IN HOUSEHOLD. Earthing requirements The earthing installation should be carried out in accordance with the local wiring regulation. Where EARTHING of the premises is not evident, it is necessary to run an EARTH CONDUCTOR and solidly connect an earth rod to the installation.
ELECTRICAL REQUIREMENTS 1) The shower heater unit must be connected to its own independent electrical circuit 2) Before beginning any work on the electric installation be sure that main breakerpan- el switch is ..O ” to avoid any danger of electric shock. All mounting and plumbing must be completed before proceeding with electrical hook-up.Lead the power cable from the indoor fuse distributor board or Miniature Circuit Breaker (MCB) to a 10mA RCD and from RCD to ON/OFF Double-Pole switch outside the bathroom.
WATER REQUIREMENTS Plumbing Schematic Diagram Seers Eco Hot Water Dispenser can be tted in your home regardless of the the type of plumbing system as in most cases they can operate directly o main cold water supply. SITING OF THE SHOWER For ease of servicing, the unit must always be mounted on the surface of tiled walls.
INSTALLATION The installation of the product must comply to national guidelines for electrical wiring in residential buildings 1) Unfasten the screws on bottom to remove front cover. 2) Drill hole on wall to mount heater according to hole position. 3)Fix Front Panel and fasten screws...
OPERATING MODE Earth point must be connected to grounding source STEP 1: Switch ON MAIN AC SUPPLY (white indicator light ON) STEP 2: Press + or - button activate heating. P0 = O P1 = Low Temperature P2 = Medium Temperature P3 = High Temperature STEP 3: Turn ON water supply.
TROUBLESHOOTING Please be assured that following situation is normal: 1) Water temperature will vary according to inlet water ow rate. DESCRIPTION POSSIBLE CAUSE REMEDIES Heater not operating 1) No Power Supply 1) Check incoming power source 2) Water shortage 2) Check incoming water 3) Contact service center Water not hot 1) System trip...
MODEL SPECIFICATION Model Specifica�on / Descrip�on SHD833 Overtemp cutoff Water flow sensor Easyfit moun�ng Leakproof heat module Adjustable temperature Hea�ng element Technical: Rated power 6.0 Kw Rated voltage 220~240VAc/1phase Rated current 25 Amp 12mA RCD Rated Trip Current Connec�ng cable size Output temperature 40°c ~ 50°c IP25...
Page 12
SEERS MARKETING SDN BHD (917949-V) No. 4, Jalan Utarid U5/18A, Seksyen U5, 40150 Shah Alam, Selangor Darul Ehsan, Malaysia. Tel: +603-7842 2871 Fax: +603-78439971 Email: sales@seers.com.my Website: www.seers.com.my...
Need help?
Do you have a question about the MULTIPOINT SHD833 and is the answer not in the manual?
Questions and answers