POWERSIDE IN-SITE MV Quick Start Installation Manual

POWERSIDE IN-SITE MV Quick Start Installation Manual

Intelligent power system monitoring

Advertisement

Quick Links

IN-SITE
INTELLIGENT POWER SYSTEM MONITORING
Quick Start Installation Guide – Medium Voltage Package
WARNING— Death, serious injury, or fire hazard could result from improper connection or operation of this instrument.
Read and understand this manual before connecting the device.
If this equipment is not used in a manner specified by the manufacturer, the protection provided by the equipment may be impaired. Installation, service, and
maintenance of your In-Site device must be performed by a licensed electrician in compliance with all applicable national and local codes and regulations.
2020 Power Standards Ltd. All rights reserved. No part of this document may be copied, reproduced, or translated into another language without the prior written
consent of Power Sensors Ltd. "PQube®" is a registered trademark of Power Standards Lab. Power Survey and Power Standards Lab (DBA) Powerside
The information contained in this document is subject to change without notice. POWERSIDE MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL,
INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE. Powerside shall not be liable for errors
contained herein or for incidental or consequential damages in connection with the furnishing, performance, or use of this material. If you do not accept this
limitation on liability, please return the product to Powerside prior to use. Product manufactured in the United States of America.
Visit Powerside.com for the latest installation
instructions and useful tips on power quality.
Page 1
©
2008–
In-Site Quick Start Guide MV (V.2)
Technical Support
US 1 (888) 736-4347 ǀ Canada 1 (877) 333-8392
In-Site.support@powerside.com

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IN-SITE MV and is the answer not in the manual?

Questions and answers

Summary of Contents for POWERSIDE IN-SITE MV

  • Page 1 Power Sensors Ltd. “PQube®” is a registered trademark of Power Standards Lab. Power Survey and Power Standards Lab (DBA) Powerside The information contained in this document is subject to change without notice. POWERSIDE MAKES NO WARRANTY OF ANY KIND WITH REGARD TO THIS MATERIAL, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR USE.
  • Page 2 Required materials 4 ea. of either #10 to #1/4 screws   Powerside Commissioning App downloaded from the Apple or Google Play Store. Login credentials provided by Powerside. Contact Powerside Technical Support.  In-Site Quick Start Guide MV (V.2) Visit Powerside.com for the latest installation Technical Support instructions and useful tips on power quality.
  • Page 3 Using installer-provided wiring connect the power supply to a 120Vac source to terminals 11-12.    In-Site Quick Start Guide MV (V.2) Visit Powerside.com for the latest installation Technical Support instructions and useful tips on power quality. Page 3 US 1 (888) 736-4347 ǀ...
  • Page 4 See Figure 4. If the unit does not power-up check the wiring. If the problem persists, contact Technical Support.  In-Site Quick Start Guide MV (V.2) Visit Powerside.com for the latest installation Technical Support instructions and useful tips on power quality. Page 4 US 1 (888) 736-4347 ǀ...
  • Page 5 In-Site Gateway Indoor Installation Diagram LV Installation (up to 600V) Inside Building Utility Power Disconnect Switch Transformer Utility Utility Building Disconnect Meter Disconnect Transformer Distribution Panel - 3-phase Motors Distribution Panel - MV Installation (above 600V) Single Phase Lighting & Appliances...
  • Page 6  Figure 4 Figure 5  Activate the In-Site gateway using the Powerside Commissioning In-Site phone App. Commissioning takes  approximately 15~20 minutes.  Launch the Powerside Click on the serial number of your Click on each parameter to verify and Commissioning App.
  • Page 7 Earth current will be calculated direction. Tips: If you get the errors below, move your phone closer to the device, hit OK to try again or contact Powerside support. In-Site Quick Start Guide MV (V.2) Visit Powerside.com for the latest installation Technical Support instructions and useful tips on power quality.
  • Page 8 In-Site. support@powerside.com for assistance or further information on our product. Powerside® and PQube® are registered trademarks of Power Survey and Equipment Ltd. and Power Standards Lab. © 2020 Powerside. All rights reserved. In-Site Quick Start Guide MV (V.2) Visit Powerside.com for the latest installation Technical Support instructions and useful tips on power quality.

Table of Contents