Download Print this page

GE LED 100L C9 Assembly Instructions page 2

Advertisement

Available languages

Available languages

LED 100L C9 Assembly Instructions
ITEM No.97775LO
Assembly Parts
② Assembly
④ Assembly Complete
① Assembly
③ Assembly
1.Carefully remove the bladed plug from the opening
on the side of the spool.
2.With one hand gripping the center handle, use the
knob to unreel the two light string sets.
3.Remove the end connector from the opening on
the side of the spool.
4.At season's end, place the end connector through
a slotted side opening in the spool and reel both light
string onto the spool as noted in step 2.
A . B . C :
Tear off dotted
lines on both side
as shown.
Insert knob into
hole as shown.
Printed in China 2022

Advertisement

loading

This manual is also suitable for:

97775lo