Vag HYDRUS G Operation And Maintenance Instruction

Underground hydrant

Advertisement

Quick Links

Operation and Maintenance Instructions
VAG HYDRUS
G Underground Hydrant
®
KAT 1611-B1 Edition1 12-18

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HYDRUS G and is the answer not in the manual?

Questions and answers

Summary of Contents for Vag HYDRUS G

  • Page 1 Operation and Maintenance Instructions VAG HYDRUS G Underground Hydrant ® KAT 1611-B1 Edition1 12-18...
  • Page 2: Table Of Contents

    Contents VAG reserves the right to make technical changes and Inhalt use materials of similar or better quality without express notice. The pictures are non-binding. General 1.1 Safety 1.2 Proper use 1.3 Identification Transport and Storage 2.1 Transport 2.2 Storage Product features 3.1 Features and function description...
  • Page 3: Safety

    Nominal diameter of the valve Arbitrary alterations of this product and the parts supplied with it are not allowed. VAG will not assume any liability for consequenti- Nominal pressure of the valve al damage due to non-compliance with these instructions.
  • Page 4: Product Features

    Without a seepage stone the lower draining point must be sur- 3.1 Features and function description rounded by packed gravel or crushed rock that permits draining. In its dimensions, function and hygienic characteristics the VAG The draining area (immediately above the flange connection) must ®...
  • Page 5: Set-Up And Operation Of The Valve

    Picture 3: Detailed view of spigot version Caution!! According to the technical standard a leaka- Before filling in the pipe trench install the appropriate VAG seepa- ge rate of only E in accordance with DIN EN 1226-1 is ge stone for the safe draining of the underground hydrant.
  • Page 6: Operation

    Caution !! By not opening the standpipe valve strong overpressure can build up when closing the hydrant shut-off. ® Picture 6: VAG HYDRUS G with claw, muzzle protector and plastic cover (2.2) VAG Operation and Maintenance Instructions • 6...
  • Page 7: Maintenance And Repair

    6.2 Inspection and operation intervals the valve or its assemblies, shut-off the pressurised pipeline, de- pressurise it and secure it against inadvertent activation. Tightness, movement and corrosion protection of the VAG HYD- ® G Underground Hydrant should be checked at least once After completing the maintenance works and before resuming every 4 years (DVGW worksheet W 392).
  • Page 8: Visual And Function Check

    Make sure to follow 6.1 for all maintenance and servicing work. below the bonnet (7) and pull up as far as it goes. You may need Refer to VAG Spare Parts List KAT 1611-E for all required spare to employ additional tools. Then screw off the stem in clockwise parts.
  • Page 9: Trouble-Shooting

    Fax: +49 (621) 749-2153 info@vag-group.com http://www.vag-group.com Service Our service hotline can be reached 24/7 world-wide. In case of emergency, please contact us by phone. Service hotline: +49 621 - 749 2222 Service per email: service@vag-group.com VAG Operation and Maintenance Instructions • 9...
  • Page 10 VAG GmbH Carl-Reuther-Str. 1 68305 Mannheim Germany Tel. +49 6 21 749- 0 +49 6 21 749- 2153 info@vag-group.com www.vag-group.com...

Table of Contents